Amended 06/10/2025 by Ord. 2025 - 34 | Page 1 |
Salt Lake City |
Consolidated Fee Schedule |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 2 |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 3 |
Amended By: | Code Sections Affected: | ||||
Ordinance 2011-44 | 5.04.070 | 5.48.030 | 5.76.120 | 5.76.120 | 15.16.090 |
5.09.010 | 5.56.040 | 5.90.010 | 5.90.010 | 17.16.670 | |
5.14.040 | 5.60.030 | 6.16.030 | 6.16.030 | 17.72.030 | |
5.16.060 | 5.61.120 | 12.56.170 | 12.56.170 | 17.81.200 | |
5.16.180 | 5.64.280 | 12.56.210 | 12.56.210 | 18.44.030 | |
5.37.080 | 5.70.040 | 14.52.030 | 14.52.030 | ||
5.42.030 | 5.74.080 | 15.16.031 | 15.16.031 | ||
Ordinance 2011-75 | 15.16.031 | ||||
Ordinance 2012-3 | 8.04.065 | 8.04.070 | |||
Ordinance 2012-6 | 8.06.010 | ||||
Ordinance 2012-27 | 18.98.190 | ||||
Ordinance 2012-44 | 9.08.030 | 15.16.090 | 16.56.050 | 16.60.120 | |
12.56.170 | 16.12.140 | 16.56.090 | 17.04.030 | ||
12.56.240 | 16.12.150 | 16.56.100 | 17.16.670 | ||
15.16.020 | 16.12.155 | 16.56.130 | 17.16.680 | ||
15.16.031 | 16.12.160 | 16.56.150 | 17.64.040 | ||
15.16.035 | 16.12.170 | 16.56.170 | 17.72.030 | ||
15.16.060 | 16.12.180 | 16.56.180 | 18.44.030 | ||
15.16.080 | 16.12.190 | 16.60.110 | 21A.64.010 | ||
Ordinance 2012-54 | 8.04.135 | ||||
Ordinance 2012-69 | 15.16.090 | ||||
Ordinance 2012-93 | 17.90.020 | 17.95.300 | |||
Ordinance 2013-17 | 15.16.010 | 15.16.110 | |||
Ordinance 2013-28 | 2.12.040 | 3.02.020 | |||
Ordinance 2013-37 | 2.75.040 | ||||
Ordinance 2013-38 | 3.16.050 | ||||
Ordinance 2013-39 | 03.02.030 Annual CPI Adjustment | ||||
Ordinance 2013-40 | 3.16.040 | ||||
Ordinance 2013-42 | 15.16.020 | ||||
Ordinance 2013-43 | 12.96.025 | ||||
Ordinance 2013-51 | 15.24.290 | ||||
Ordinance 2014-10 | 18.98.190 | 17.81.400 |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 4 |
Ordinance 2014-27 | 17.16.590 | 17.16.670 | |||
Ordinance 2014-41 | Annual CPI Adjustment | 2.12.040 | 3.50.020 | 5.16.090 | |
5.51.027 | 15.16.090 | 15.24.120 | 18.98.090 | 18.98.160 | |
3.16.005 | 12.56.600 | 15.16.120 | |||
Ordinance 2014-50 | 15.16.031 | 15.16.035 | |||
Ordinance 2014-51 | 15.16.031 | ||||
Ordinance 2014-55 | 21A.06.030 | 21A.46.120 | |||
21A.06.050 | 21A.50 | ||||
Ordinance 2015-01 | |||||
Ordinance 2015-44 | |||||
Ordinance 2015-65 | 5.04.070 | 5.15.020 | |||
Ordinance 2015-72 | 9.08.030 | 9.08.115 | 9.08.140 | 9.08.200 | |
Ordinance 2016-01 | 12.96.025 | ||||
Ordinance 2016-10 | 21A.16.010 | ||||
Ordinance 2016-41 | 2.61.030 | ||||
Ordinance 2016-43 | 15.16.090 | ||||
Ordinance 2016-44 | |||||
Ordinance 2016-45 | 15.16.031 | 15.16.035 | |||
Ordinance 2016-46 | Authority to Set Municipal Fees | ||||
Ordinance 2016-49 | 09.08.030 | 15.16.090 | |||
Ordinance 2016-58 | 5.63.050 | ||||
Ordinance 2016-79 | 18.98.020 | 18.98.050 | |||
Ordinance 2017-09 | 12.56.00 | 12.28.095 | |||
Ordinance 2017-11 | 15.16.031 | 15.16.035 | |||
Ordinance 2017-22 | 15.16.031 | ||||
Ordinance 2017-38 | Annual CPI Adjustment | ||||
Ordinance 2017-52 | Federal Trade Zone |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 5 |
Ordinance 2018-11 | 9.08.200 | ||||
Ordinance 2018-25 | 18.58.010 | ||||
Ordinance 2018-34 | Annual CPI Adjustment | ||||
Ordinance 2018-42 | 14.56.060 | 14.56.070 | |||
Ordinance 2019-06 | 18.98.020 | 18.98.120 | 18.98.160 | ||
Ordinance 2019-10 | 16.60.065 | 16.64.030 | |||
Ordinance 2019-21 | 8.04.390 | ||||
Ordinance 2019-30 | Annual CPI Adjustment | ||||
Ordinance 2019-31 | |||||
Ordinance 2019-32 | 12.56.550 | 12.56.580 | |||
Ordinance 2019-55 | |||||
Ordinance 2020-26 | Annual CPI Adjustment | ||||
Ordinance 2020-30 | |||||
Ordinance 2020-53 | 18.48.100 | ||||
Ordinance 2021-11 | 12.58.040 | ||||
Ordinance 2021-35 | Annual CPI Adjustment | ||||
Ordinance 2021-41 | 8.15.020 | 8.15.025 | 8.15.027 | ||
Ordinance 2022-37 | Annual CPI Adjustment | ||||
Ordinance 2022-56 | Amendments | ||||
Ordinance 2022-65 | 14.56.020 | ||||
Ordinance 2023-31 | Annual CPI Adjustment | ||||
Ordinance 2023-37 | 3.16.040 | ||||
Ordinance 2023-38 | 14.12.130 | ||||
Amended 06/10/2025 by Ord. 2025 - 34 | Page 6 |
Ordinance 2023-49 | |||||
Ordinance 2024-51 | Annual CPI Adjustment | ||||
Ordinance 2024-85 | |||||
Ordinance 2024-91 | 18.12.030 | 18.20.020 | 18.20.200 | 18.24.030 | 18.28.040 |
Ordinance 2025-08 | |||||
Ordinance 2025- | 15.16.120 | ||||
Ordinance 2025-34 | Annual CPI Adjustment | ||||
Amended 06/10/2025 by Ord. 2025 - 34 | Page 7 |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 8 |
Salt Lake City Consolidated Fee Schedule | ||||||||||||||||
AIRPORT | ||||||||||||||||
For questions regarding Airport Fees Contact: 801-575-2721 | ||||||||||||||||
Service | Fee | Additional Information | Section | |||||||||||||
Air Carrier Fees | ||||||||||||||||
Landing Fees | $5.88 | Per 1,000 lbs gross certified landing weights | 16.10.090; 16.30.010 | |||||||||||||
Terminal rent - conditioned | $322.57 | Per square foot / per year | 16.10.090; 16.30.010 | |||||||||||||
Terminal rent - unconditioned | $161.29 | Per square foot / per year | 16.10.090; 16.30.010 | |||||||||||||
Common use gate | $667.00 | Per use / use equals three hours | 16.10.090; 16.30.010 | |||||||||||||
Common use boarding bridge | $17.00 | Per use / use equals three hours | 16.10.090; 16.30.010 | |||||||||||||
Common use ticket counter | $55.00 | Per use / use equals three hours | 16.10.090; 16.30.010 | |||||||||||||
Common use bag make-up | $640.00 | Per use / use equals three hours | 16.10.090; 16.30.010 | |||||||||||||
Common use bag claim | $7.56 | Per enplaned passenger | 16.10.090; 16.30.010 | |||||||||||||
Common use - unscheduled | $500.00 | Per every 30 minutes | 16.10.090; 16.30.010 | |||||||||||||
Early bag storage fee | $11.06 | Per bag | 16.10.090; 16.30.010 | |||||||||||||
FIS facility and international bag claim area | $5.42 | Per deplaned passenger | 16.10.090; 16.30.010 | |||||||||||||
GSE storage area | $0.50 | 120% of prevailing ground rent per square foot | 16.10.090; 16.30.010 | |||||||||||||
Remain overnight (RON) - aircraft groups 1 & 2 | $100.00 | Aircraft remaining overnight & parked beyond the bounds of each leased terminal aircraft apron | 16.10.090; 16.30.010 | |||||||||||||
Remain overnight (RON) - aircraft groups 3 & higher | $200.00 | |||||||||||||||
Stacking charges - aircraft groups 1 & 2 | $50.00 | Airline stack aircraft beyond the bounds of each leased terminal aircraft apron | 16.10.090; 16.30.010 | |||||||||||||
Stacking charges - aircraft groups 3 & higher | $100.00 | |||||||||||||||
Preferential use boarding bridges - maintenance | $1,150.00 | Monthly charge per bridge | 16.10.090; 16.30.010 | |||||||||||||
Preferential use boarding bridges - parts & supplies | $650.00 | Monthly charge per bridge | 16.10.090; 16.30.010 | |||||||||||||
Cargo ramp use fee | $18.25 | Per use fee | 16.10.090; 16.30.010 | |||||||||||||
Cargo ramp weight fee | $0.27 | Per 1,000 lbs gross certified landing weights | 16.10.090; 16.30.010 | |||||||||||||
Fuel royalties | $0.06 | Per gallon of fuel | 16.10.090; 16.10.170; 16.30.010 | |||||||||||||
For landing fee exemptions: see Administrative Rules and Regulations | ||||||||||||||||
Aircraft Parking Fees | ||||||||||||||||
Daily | ||||||||||||||||
Less than 12,500 pounds (U42 - SVRA) | $20.00 | Ramp and tie down parking | 16.10.090 | |||||||||||||
12,500 pounds to 44,999 pounds (U42 - SVRA) | $65.00 | Ramp and tie down parking | 16.10.090 | |||||||||||||
Tooele Valley Airport (TVY) | $20.00 | Ramp and tie down parking | 16.10.090 | |||||||||||||
Aircraft Parking - Shade hangar (U42 - SVRA) | $35.00 | Daily parking fee | 16.10.090 | |||||||||||||
Aircraft Parking - Single hangar (U42 - SVRA) | $65.00 | Daily parking fee | 16.10.090 | |||||||||||||
Aircraft Parking - Twin hangar (U42 - SVRA) | $95.00 | Daily parking fee | 16.10.090 | |||||||||||||
Aircraft parking fees exemption: Any person engaging in air transportation services having an assigned gate hold |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 9 |
Aeronautical Services | ||||||||||||||||
Aircraft rental permit | $250.00 | Annual, per rental aircraft | 16.10.090; 16.30.010 | |||||||||||||
Aircraft sales permit | $250.00 | Annual | 16.10.090; 16.30.010 | |||||||||||||
Commercial flight service permit | $250.00 | Annual | 16.10.090; 16.30.010 | |||||||||||||
Commercial Flight service aircraft owner permit | $250.00 | Annual, per aircraft in addition to Commercial Flight Service Permit Fee | 16.10.090; 16.30.010 | |||||||||||||
Flight training permit - Initial | $250.00 | Annual | 16.10.090; 16.30.010 | |||||||||||||
Flight training permit - Renewal | $150.00 | Annual | 16.10.090; 16.30.010 | |||||||||||||
Flight training aircraft owner permit | $250.00 | Annual, per aircraft in addition to flight training owner permit fee | 16.10.090; 16.30.010 | |||||||||||||
Airframe and/or Power Plant Repair | $250.00 | Annual | 16.10.090; 16.10.200; 16.30.010 | |||||||||||||
Fueling permit fee | $50.00 | Per company | 16.10.090; 16.10.170; 16.30.010 | |||||||||||||
Fueling permit annual verification fee | $10.00 | Per fueler-endorsed badge holder | 16.10.090; 16.10.170; 16.30.010 | |||||||||||||
Radio, instrument or propeller repair service permit | $250.00 | Annual | 16.10.090; 16.10.190; 16.30.010 | |||||||||||||
Hangar Application Wait List Fee | $150.00 | $50 non-refundable | 16.10.090 | |||||||||||||
Miscellaneous business permit | $250.00 | Annual | 16.10.090; 16.30.010 | |||||||||||||
Multiple aeronautical services | Any person desiring to engage in two (2) or more commercial aeronautical activities is responsible for payment of all fees as established for each aeronautical activity engaged in; however, fees for owned aircraft (as the term "owner" is defined in Section 16.04.30 of this title), will be assessed for one (1) aeronautical activity only. | 16.10.090: 16.30.010 | ||||||||||||||
Any Person offering any such services, or combinations thereof, shall do so under written lease or permit agreement with the City. | ||||||||||||||||
AVI Fees (Automated Vehicle Identification) | ||||||||||||||||
Vehicle Category | ||||||||||||||||
1 to 5 passengers | $1.71 | |||||||||||||||
6 to 9 passengers | $3.10 | |||||||||||||||
10 to 15 passengers | $5.14 | |||||||||||||||
16 to 24 passengers | $8.23 | |||||||||||||||
>24 passengers | $10.30 | |||||||||||||||
Campus Dwell Time | ||||||||||||||||
30 minutes | No Cost | |||||||||||||||
30-45 minutes | $2.00 | |||||||||||||||
45-60 minutes | $10.00 | |||||||||||||||
Every 5 minutes over 60 minutes | $20.00 | |||||||||||||||
Terminal Front Dwell Time | ||||||||||||||||
0 - 10 minutes | No Cost | |||||||||||||||
10-20 minutes | $3.00 | |||||||||||||||
20-30 minutes | $20.00 | |||||||||||||||
Every minute over 30 minutes | $5.00 | |||||||||||||||
Permit Fees | ||||||||||||||||
Non-returned GT inspection seal (permit) | $500.00 | |||||||||||||||
Low profile permit fee | $150.00 | |||||||||||||||
Badge/Fingerprint/Threat Assessment/Ramp Permit/Key Replacement Fees | ||||||||||||||||
Fingerprint processing (FBI background check)* | $21.00 | Per set of fingerprints processed | 16.10.090 | |||||||||||||
Fingerprint processing with RAP back enrollment* | $14.00 | Per set of fingerprints processed | 16.10.090 | |||||||||||||
RAP back enrollment (one-time fee) | $7.00 | Per enrolled employee | 16.10.090 | |||||||||||||
*$21.00 fee only applies to applicants not enrolled in RAP back | ||||||||||||||||
Security threat assessment fee | $9.00 | Per employee badge | 16.10.090 | |||||||||||||
Renewal fee | $21.00 | Per employee badge | 16.10.090 | |||||||||||||
Replacement fee for lost/stolen badge | $75.00 | Refund of $50 will be issued for returned lost/stolen badge if returned prior to expiration | 16.10.090 | |||||||||||||
Fee for non-returned badge | $250.00 | Fee for each badge not returned | 16.10.090 | |||||||||||||
Badge Reinstatement Fee for Security Violations | ||||||||||||||||
First Offense | $100 | 16.10.090 | ||||||||||||||
Second Offense | $200 | Within a two-year period | 16.10.090 | |||||||||||||
Third Offense | $200 | Within a two-year period (a third offense will result in ID badge being revoked, unless successfully appealed) | 16.10.090 | |||||||||||||
Fee for non-returned badge - Contractors only | $400.00 | Fee for each badge not returned | 16.10.090 | |||||||||||||
Fee for failure to deactivate badge | $100.00 | Per non-deactivated badge | 16.10.090 |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 10 |
Hangar tenant | $25.00 | Per badge | 16.10.090 | |||||||||||||
Ground transportation | $65.00 | Per badge | 16.10.090 | |||||||||||||
Ramp permit replacement fee | $100.00 | Fee for lost ramp permit | 16.10.090 | |||||||||||||
Key replacement fee | $50.00 | Fee for each lost key | 16.10.090 | |||||||||||||
Key replacement fee (audited) | $200.00 | Fee for each lost key | 16.10.090 | |||||||||||||
Lock re-core fee | $50.00 | Fee for each lost key | 16.10.090 | |||||||||||||
Bike path - initial badge fee | $15.00 | Per badge | 16.10.090 | |||||||||||||
Bike path - replacement fee for lost/stolen badge | $15.00 | Per badge | 16.10.090 | |||||||||||||
Contractor badge deposit - up to $500k contract value | $5,000.00 | Deposit may be required per project, based on contract value. Contact Airport representative for more information. | 16.10.090 | |||||||||||||
Contractor badge deposit - >$500k - $1M contract value | $10,000.00 | |||||||||||||||
Contractor badge deposit - >$1M - $5M contract value | $15,000.00 | |||||||||||||||
Contractor badge deposit - >$5M - $10M contract value | $20,000.00 | |||||||||||||||
Contractor badge deposit - >$10M - $25M contract value | $25,000.00 | |||||||||||||||
Contractor badge deposit - >$25M - $50M contract value | $50,000.00 | |||||||||||||||
Contractor badge deposit - >$50M - $100M contract value | $75,000.00 | |||||||||||||||
Contractor badge deposit - >$100M contract value | $100,000.00 | |||||||||||||||
Conference Room and Other Rental Fees | ||||||||||||||||
Airport board room (2,536 sq ft / 50 seats) | $300.00 | For use beyond 1 - 4 hours, an hourly charge of one quarter (1/4) of the overall fee will be applied. | 16.10.090 | |||||||||||||
Sandstone conference room (580 sq ft / 16 seats)* | $150.00 | |||||||||||||||
Limestone conference room (585 sq ft / 16 seats)* | $150.00 | |||||||||||||||
Jasper conference room (585 sq ft / 16 seats)* | $150.00 | |||||||||||||||
Topaz conference room (590 sq ft / 16 seats)* | $150.00 | |||||||||||||||
Copper conference room (827 sq ft / 20 seats) | $200.00 | |||||||||||||||
ATAC - room (3,600 sq ft / 70 seats) | $400.00 | |||||||||||||||
ATAC - patio (4,000 sq ft / 60 seats) | $300.00 | |||||||||||||||
Airport picnic pavilion | $400.00 | |||||||||||||||
*Sandstone and Limestone rooms can be combined; Jasper and Topaz rooms can be combined. | ||||||||||||||||
Table and chairs rental (11 - 20 tables & 50 - 100 chairs) | $368.00 | Seating for 51 - 100 people | 16.10.090 | |||||||||||||
Table and chairs rental (21 - 30 tables & 101 - 150 chairs) | $508.00 | Seating for 101 - 150 people | 16.10.090 | |||||||||||||
Table and chairs rental (31 - 40 tables & 151 - 200 chairs) | $553.00 | Seating for 151 - 200 people | 16.10.090 | |||||||||||||
Table and chairs rental (41 - 50 tables & 201 - 250 chairs) | $693.00 | Seating for 201 - 250 people | 16.10.090 | |||||||||||||
Table and chairs rental (51 - 60 tables & 251 - 300 chairs) | $738.00 | Seating for 251 - 300 people | 16.10.090 | |||||||||||||
Day use areas | $50.00 | Per day | 16.10.090 | |||||||||||||
Customer Facility Charge (CFC) | $5.00 per transaction day | Up to and including a maximum of twelve (12) days per rental contract for a vehicle from an On-Airport Rental Car Operator. | 16.10.100 | |||||||||||||
Filming Activity Charges | ||||||||||||||||
Filming permit fee (1 - 8 people in filming crew) | $250.00 | 16.10.090 | ||||||||||||||
Filming permit fee (9 - 15 people in filming crew) | $500.00 | 16.10.090 | ||||||||||||||
Filming permit fee (16+ people in filming crew) | $1,000.00 | Per hour | 16.10.090 | |||||||||||||
Basic location charge (1 - 4 people) | $50.00 | Per hour | 16.10.090 | |||||||||||||
Basic location charge (5 - 8 people) | $100.00 | Per hour | 16.10.090 | |||||||||||||
Basic location charge (9 - 16 people) | $150.00 | Per hour | 16.10.090 | |||||||||||||
Basic location charge (17 - 30 people) | $200.00 | Per hour | 16.10.090 | |||||||||||||
Basic location charge (30+ people) | $250.00 | Per hour | 16.10.090 | |||||||||||||
Use of Airport staging/parking lots | $300.00 | Per day | 16.10.090 | |||||||||||||
Airport personnel (security) | $55.00 | Per person / per hour | 16.10.090 | |||||||||||||
Assistance from Airport vehicles | $50.00 | Per vehicle / per day | 16.10.090 | |||||||||||||
Off Airport Car Rental Operator | 10% of gross sales at airport | Paid within 15 days of the end of each month | 16.10.090 | |||||||||||||
Off Airport In-Flight Caterers | 8% of gross sales at airport | Paid within 15 days of the end of each month | 16.10.090 |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 11 |
Parking | ||||||||||||||||
Economy Lot | ||||||||||||||||
First hour | $2 | 16.10.090; 16.10.180; 16.40.070 | ||||||||||||||
Each additional hour | $1 | 16.10.090; 16.10.180; 16.40.070 | ||||||||||||||
Daily maximum | $12 | 16.10.090; 16.10.180; 16.40.070 | ||||||||||||||
Hourly/Daily (Parking Garage) | ||||||||||||||||
First hour | $5 | 16.10.090; 16.10.180; 16.40.070 | ||||||||||||||
Each additional hour | $5 | 16.10.090; 16.10.180; 16.40.070 | ||||||||||||||
Daily maximum | $45 | Max amount based on demand | 16.10.090; 16.10.180; 16.40.070 | |||||||||||||
Daily reserved premier parking | $10 | Hourly rate | 16.10.090; 16.10.180; 16.40.070 | |||||||||||||
Daily reserved premier parking | $60 | Daily maximum | 16.10.090; 16.10.180; 16.40.070 | |||||||||||||
Lot E | ||||||||||||||||
First hour | $5 | 16.10.090; 16.10.180; 16.40.070 | ||||||||||||||
Each additional hour | $5 | 16.10.090; 16.10.180; 16.40.070 | ||||||||||||||
Daily maximum | $25 | 16.10.090; 16.10.180; 16.40.070 | ||||||||||||||
Disabled Parking | ||||||||||||||||
Vehicles displaying disabled license plate and/or placard can park in designated parking stalls in the garage at the economy lot rate of $12 per day. | ||||||||||||||||
Disabled Veteran Parking | ||||||||||||||||
Vehicles displaying Utah Disabled Veteran license plate issued by the Utah Department of Motor Vehicles, having a Disabled Veteran (DV) designation may receive complimentary parking at the Salt Lake City International Airport (SLCIA). Restrictions and limitations apply. | ||||||||||||||||
Parking Garage* | Five (5) days of complimentary parking if space is available, any days beyond five (5) will be charged at the posted daily garage rate. | |||||||||||||||
Economy Lot* | Ten (10) days of complimentary parking if space is available, any days beyond ten (10) will be charged at the posted Economy Lot rate. | |||||||||||||||
*If you plan to park longer than 30 consecutive days, please contact staff at SLCAIRPORT@SPPLUS.COM or 801-575-2887 so your vehicle will not be considered abandoned. | ||||||||||||||||
Employee Parking | ||||||||||||||||
Domicile | $37 | Per month | 16.10.090; 16.10.180; 16.40.070 | |||||||||||||
Non-domicile | $64 | Per month | 16.10.090; 16.10.180; 16.40.070 | |||||||||||||
Towing Fee | ||||||||||||||||
Drop fee | $25 | Per vehicle | 16.10.090; 16.10.180; 16.40.070 | |||||||||||||
Tow to storage area | $50 | Per vehicle, plus daily rate (economy parking lot) | 16.10.090; 16.10.180; 16.40.070 |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 12 |
ANIMAL SERVICES | |||||
Note: Salt Lake City contracts with Salt Lake County for Animal Services. | |||||
Animal service fees are set and administered by Salt Lake County. | |||||
http://slco.org/animal-services/about-us/fees-and-services/ | |||||
For questions regarding Animal Service Fees Contact: 385-468-7387 |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 13 |
BUILDING RENTAL/USE: CITY and COUNTY BUILDING | ||||||
For questions regarding Building and Square fees Contact: 801.535.7280 | ||||||
Service | Fee | Additional Information | Section | |||
Activity with food | $957 | 15.14.020 | ||||
Filming (Commercial) | ||||||
Fewer than 8 staff, crew and other persons | $368 | Each 4 hour block | 15.14.020 | |||
8 - 15 staff, crew and other persons | $722 | Each 4 hour block | 15.14.020 | |||
More than 15 staff, crew and other persons | $1,544 | Each 4 hour block | 15.14.020 | |||
Miscellaneous Meetings | ||||||
Regular city business hours (8am - 5pm) | $55/hr | Up to 40 people, no more than three hours | 15.14.020 | |||
Non-city business hours | $55/hr | See Section 15.14.020 | 15.14.020 | |||
Supplemental Charge for Exclusive Building Use | $147 | 15.14.020 | ||||
Wedding Ceremony | ||||||
Base fee for two hours | $235 | No food | 15.14.020 | |||
Damage to City Property | City's Cost | 3.50.080 | ||||
Janitorial | ||||||
Regular janitorial services | $25 | 3.50.080 | ||||
Upholstery cleaning | $25 | 3.50.080 | ||||
Power Wash | $30 | 3.50.080 | ||||
Carpet Cleaning - Water extraction (non- wool carpets) | $0.15 sq/ft or $300 minimum | 3.50.080 | ||||
Carpet Cleaning - Water extraction (wool carpets) | $550 minimum up to 500 sq/ft | 3.50.080 | ||||
Maintenance Worker | ||||||
Painter | $44.42 | 3.50.080 | ||||
Plumber | $41.73 | 3.50.080 | ||||
Carpenter | $42.25 | 3.50.080 | ||||
General Maintenance Worker | $42.25 | 3.50.080 | ||||
Security Guard | $33.33 | 3.50.080 | ||||
See Section 15.14.010 for damage, additional fees, and exceptions. |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 14 |
BUSINESS LICENSING | ||||||
For questions regarding Business Licensing Fees Contact: 801-535-6644 | ||||||
Service | Fee | Additional Information | Section | |||
All Businesses pay a Base License Fee and Employee Fee as listed below | ||||||
Base License Fees | ||||||
Before Sept' 25 | Effective Sept' 25 | |||||
Home occupation businesses | $148 | $153 | 5.04.070 | |||
Commercial | $187 | $193 | 5.04.070 | |||
Booth Rental | $187 | $193 | 5.04.070 | |||
Residential Rental | $187 | $193 | 5.04.070 | |||
Employee Fee | $27 | $28 | Annual, per full or part-time employee, if business has more than one employee. | |||
Additional fees may apply depending on type of business according to list below | ||||||
Before Sept' 25 | Effective Sept' 25 | Fees with an effective date other than July 1, 2011 are indicated by two columns. | ||||
Amusement Devices | $4 | $5 | Annual, per device | 5.70.040 | ||
Amusement Devices Wholesale | $32 | $33 | Annual | 5.76.120 | ||
Apartment Units | See Rental Dwelling | 5.90.010 | ||||
Application for Certificates | ||||||
Public convenience and necessity | $163 | $168 | 5.05.130 | |||
Auctioneer | $160 | $165 | Per auctioneer | 5.16.060 | ||
Auction House, Transient | $301 | $311 | Per day, per business | 5.16.180 | ||
Automobiles | ||||||
Auto Dealers New/Used | $73 | $75 | Annual | 5.76.120 | ||
Parts sales | $137 | $141 | Annual | 5.76.120 | ||
Auto/RV/Other Rental Agencies | $32 | $33 | Annual | 5.76.120 | ||
Auto/Truck & Mechanic Related Services | $73 | $75 | Annual | 5.76.120 | ||
Towing / Wrecking | $25 | $26 | Annual | 5.76.120 | ||
Booting | Base License Fee | Annual | 5.76.120 | |||
Police Rotation | $24 | $25 | Annual | 5.76.120 | ||
Automobile Trailer Court | Refer to base license fee listed in this section | Annual per trailer, per space on premises, see section 5.86.056 | 5.86.056 | |||
Financial Institution | $154 | $160 | Annual | 5.76.120 | ||
Alcohol Sales | Before Sept' 25 | Effective Sept' 25 | ||||
Retail Alcohol/Beer | $381 | $394 | Annual, per license | 5.90.010 | ||
Restaurant | $301 | $311 | Annual, per license | 5.90.010 | ||
Bar or Tavern | $427 | $441 | Annual, per license | 5.90.010 | ||
Single Event | $301 | $311 | Annual, per license | 5.90.010 | ||
Microbrew pub | $301 | $311 | Annual, per license | 5.90.010 | ||
Recreational facility beer | $381 | $394 | Annual, per license | 5.90.010 | ||
Banquet/Catering | $292 | $302 | Annual, per license | 5.90.010 | ||
Reception/Event Center | $310 | Annual, per license, requires local consent | 5.90.010 | |||
Bar Establishment | $536 | $554 | Annual, per business | 5.90.010 | ||
Beer Sales Application Fee | No charge | Fee could be assessed in future as per ordinance | 5.51.030 | |||
Billiards/Pool Tables | $4 | $4 | Annual, per device | 5.70.040 | ||
Billiards/Pool Tables - Pool Hall | $29 | $30 | Annual | 5.76.120 | ||
Business License Information Changes | Before Sept' 25 | Effective Sept' 25 | ||||
Information Change - Non Regulated | $22 | $23 | 5.02.210 | |||
Information Change - Regulated | $50 | $52 | 5.02.210 | |||
Childcare Facilities | $160 | $165 | Annual | 5.76.120 | ||
Clothing Sales | $121 | $124 | Annual | 5.76.120 | ||
Construction Business | $32 | $34 | Annual | 5.76.120 | ||
Convalescent and Retirement Facilities | $192 | $199 | Annual | 5.76.120 | ||
Reception/Venue Centers | $24 | $25 | Annual, no alcohol | 5.90.020 | ||
Dance Studio | Refer to base license fee listed in this section | 9.04.050 | ||||
Dance Hall - Public Dance Hall | Refer to base license fee listed in this section | 9.04.040 | ||||
Dating/Marriage Service | $128 | $132 | Per Business | 5.42.030 |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 15 |
Dry Cleaning and Laundry | $160 | $165 | Annual | 5.76.120 | ||
Electronic Goods Sales | $192 | $199 | Annual | 5.76.120 | ||
Consulting | $32 | $33 | Annual | 5.76.120 | ||
Entertainment | ||||||
Concert | $112 | $116 | Annual, per exhibition room | 5.90.010 | ||
Dance floor | $24 | $25 | Annual, per room | 5.90.010 | ||
Live entertainment | No charge | Fee could be assessed in future as per ordinance | 5.90.010 | |||
Theater, live | $160 | $165 | Annual, per exhibition room | 5.90.010 | ||
Theater, motion picture | No charge | Fee could be assessed in future as per ordinance | 5.90.010 | |||
Fire and Damaged Goods Sales | No charge | Fee could be assessed in future as per ordinance | 5.32.025 | |||
Fireworks | Before Sept' 25 | Effective Sept' 25 | ||||
Inside | $99 | $102 | Annual, per location | 9.20.020 | ||
Outside | $99 | $102 | Annual, per location | 9.20.020 | ||
Fireworks Sales | Refer to base license fee listed in this section | Paid at least 10 days prior to opening of business. See also 2.120.040 under Fire | 9.20.020 | |||
Furniture Sales | $73 | $75 | Annual | 5.76.120 | ||
Gas/Oil, Wholesale Gas | $326 | $337 | Annual | 5.90.010 | ||
Gas/Oil, Wholesale Businesses | $32 | $33 | Annual | 5.76.120 | ||
Gasoline Stations | $188 | $194 | Annual | 5.76.120 | ||
Government Owned Alcohol Related Business | $214 | $221 | Annual | 5.90.010 | ||
Grocery/Convenience Stores | $160 | $165 | Annual | 5.76.120 | ||
Hardware Stores | $160 | $165 | Annual | 5.76.120 | ||
Healthcare Related | $57 | $59 | Annual | 5.76.120 | ||
Ice Cream Truck Vehicle Inspection | $36 | $38 | 5.64.740 | |||
Ice Cream Truck Operator Application Fee | No more than $31 | 5.64.580 | ||||
Ice Cream Vendors | $41 | $42 | Annual | 5.90.010 | ||
Design Services | $32 | $33 | Annual | 5.76.120 | ||
Cleaning/Janitorial | $89 | $92 | Annual | 5.76.120 | ||
Legal Services/Law Office | $25 | $26 | Annual | 5.76.120 | ||
Licenses Requiring a Special Public Hearing | $73 | $76 | Plus actual costs | 5.02.240 | ||
Liquor Consumption | $32 | $34 | Annual, per license | 6.16.030 | ||
Live Entertainment | ||||||
Concerts | $24 | $25 | 5.76.120 | |||
Private Club | Refer to base license fee listed in this section | 5.28.080 | ||||
Restaurants | Refer to base license fee listed in this section | 5.28.080 | ||||
Taverns | Refer to base license fee listed in this section | 5.28.080 | ||||
Locksmiths | No Charge | Fee could be assessed in future as per ordinance | 5.90.010 | |||
Manufacturing | $57 | $59 | Annual | 5.76.120 | ||
Alcohol Manufacturing | $59 | Annual | ||||
Miscellaneous Services | $31 | $32 | Annual | 5.76.120 | ||
Mobile Food Business (Truck/Trailer) | ||||||
Standard | $103 | $103 | Also refer to base license fee for this section | 5.69.060 | ||
Reciprocal | $103 | $103 | No base license fee required | 5.69.060 | ||
Motion Picture Theaters | $116 | $120 | Annual | 5.76.120 | ||
Numismatic and/or Bullion Dealer | Refer to base license fee listed in this section | See Section 5.47.030 | 5.47.030 | |||
Nursing Home | Refer to base license fee listed in this section | See Section 5.86.306 | 5.86.306 | |||
Out of Doors - Restaurants & Occasional Banquets | No Charge | For occasional banquets, fee could be assessed in future as per ordinance | 5.54.040 | |||
Participant License Fee | Refer to base license fee listed in this section | 5.64.330 | ||||
Pawnshop and Secondhand Dealer | Before Sept' 25 | Effective Sept' 25 | ||||
Pawnbroker | $2,002 | $2,069 | Annual, per business | 5.48.030 | ||
Secondhand compact disk exchange dealer | $601 | $621 | Annual, per business | 5.60.030 | ||
Secondhand computer exchange dealer | $267 | $276 | Annual, per business | 5.60.030 | ||
Pedi-cabs | No charge | Fee could be assessed in future as per ordinance | 5.90.010 | |||
Proprietor | $51 | $53 | Per automatic amusement device | 5.12.050 | ||
Real Estate Agencies | $24 | $25 | Annual | 5.76.120 | ||
Rental Dwelling License with Good Landlord Certification (Per Ordinance) |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 16 |
Owner Occupied Rental | Base Fee | 4 units or less, owner occupies 1 of those units | 5.14.040 | |||
Dwelling units | $35 | Per rental unit | 5.14.040 | |||
Fraternities, sororities, rooming and boarding house | $35 | Per room for lodging or sleeping purposes | 5.14.040 | |||
Rental Dwelling License without Good Landlord Certification (Per Ordinance) | ||||||
Owner Occupied Rental | Base Fee | 4 units or less, owner occupies 1 of those units | 5.14.040 | |||
Dwelling units | $342 | Per rental unit | 5.14.040 | |||
Fraternities, sororities, rooming and boarding house | $342 | Per room for lodging or sleeping purposes | 5.14.040 | |||
Restaurants/Cafeterias | $121 | $124 | Annual | 5.76.120 | ||
Retail/Wholesale Sales | $57 | $59 | Annual | 5.76.120 | ||
Retail Service Station | Refer to base license fee listed in this section | 5.86.410 | ||||
Room Rentals (rooming houses, boarding houses and for profit residential treatment facilities - "Non-Residential" fee) | ||||||
Boarding/rooming house | $7 | $7 | Annual, per rental unit | 5.56.040 | ||
Hotel | $10 | $11 | Annual, per rental unit | 5.56.040 | ||
Motel | $10 | $11 | Annual, per rental unit | 5.56.040 | ||
RV Parks and Campgrounds | $31 | $32 | Annual, per space | 5.76.120 | ||
Scrap Metal Processor | Refer to base license fee listed in this section | See Section 5.58.030 | 5.58.030 | |||
Sexually Oriented Business | Before Sept' 25 | Effective Sept' 25 | ||||
Adult business | $462 | $477 | Annual, per business | 5.61.120 | ||
Nude agency | $1,201 | $1,241 | Annual, per business | 5.61.120 | ||
Nude entertainment business | $462 | $477 | Annual, per business | 5.61.120 | ||
Semi-nude dance agency | $464 | $480 | Annual, per business | 5.61.120 | ||
Semi nude dancing bar | $356 | $368 | Annual, per business | 5.61.120 | ||
Outcall agency | $1,602 | $1,655 | Annual, per agency | 5.61.120 | ||
Adult employee (non-escort) | $282 | $291 | Annual, per employee | 5.61.120 | ||
Outcall non-performer (non-escort) | $282 | $291 | Annual, per employee | 5.61.120 | ||
Nude performer employee* | $321 | $331 | Annual, per nude performer; for prorated formula see Section 5.90.010 | 5.61.120 | ||
Semi-nude dance performer* | $321 | $331 | Annual, per semi-nude performer; for prorated formula see Section 5.90.010 | 5.61.120 | ||
Semi-nude performer employee* | $321 | $331 | Annual, per semi-nude performer; for prorated formula see Section 5.90.010 | 5.61.120 | ||
Outcall performer (escort)* | $1,201 | $1,241 | Annual, per outcall performer; for prorated formula see section 5.90.010 | 5.61.120 | ||
Sexually oriented business transfer | $112 | $116 | Annual, per performer transfer | 5.61.120 | ||
Photography (adult) | $225 | $232 | Annual, per photographer | 5.61.120 | ||
*These fees shall be prorated as follows: If 180 days or fewer remain before the employer's license expires, the fee shall be 50% of the full fee. If 181 or more days remain before the employer's license expires, the full fee shall be charged | ||||||
Shared Mobility per Device | $30 | $35 | Per device | |||
Shared Mobility per Ride | $0.10 | $0.20 | Per ride | |||
Mailing/Shipping/Logistics | $57 | $59 | Annual | 5.76.120 | ||
Solicitor | $160 | $165 | Per Individual | 5.64.280 | ||
Solicitor ID Card | $37 | $38 | For period of time stated on card | 5.64.130 | ||
Solicitor Registration | $22 | $22 | For ID card | 5.64.430 | ||
Sporting Goods Sales | $57 | $59 | Annual | 5.76.120 | ||
Storage/Warehouse | $73 | $76 | Annual | 5.76.120 | ||
Theater, Concert Hall, Motion Picture House or Other Place of Amusement | $73 | $76 | Per day | 5.74.080 | ||
Temporary Merchant | Refer to base license fee listed in this section | See Section 5.64.310 | 5.64.310 | |||
Tobacco Products - Retail Sales | $137 | $141 | Annual, includes grocery and convenience stores, taverns, private clubs, hotels, motels and restaurants. | 5.76.120 | ||
Tobacco Sales | Refer to base license fee listed in this section | Annual | 5.86.480 | |||
Towing Operations | Refer to base license fee listed in this section | 5.84.140 | ||||
Unmanned Kiosks | $56 | $57 | Redbox, Best Buy, Etc | |||
Vehicle Authorized Certificate | Refer to base license fee listed in this section | 5.72.170 | ||||
Wrecker Service | Refer to base license fee listed in this section | 5.84.040 |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 17 |
CEMETERY | ||||||
For questions regarding Cemetery fees Contact: 801.596.5020 | ||||||
Service | Fee | Additional Information | Section | |||
Burial Rights | Adult | Infant | ||||
Resident | $1,713 | $857 | 15.24.120 | |||
Non-resident | $2,426 | $1,213 | 15.24.120 | |||
Continuing Care Fees | Adult | Infant | ||||
Resident | $708 | $354 | 15.24.120 | |||
Non-resident | $1,256 | $628 | 15.24.120 | |||
Transfer of Burial Rights | $228 | 15.24.180 | ||||
Continuing care on property transfer | Adult | Infant | 15.24.180 | |||
Resident | $708 | $354 | 15.24.180 | |||
Non-resident | $1,256 | $628 | 15.24.180 | |||
Opening and Closing | ||||||
Cremains | ||||||
Residents | $571 | 15.24.290 | ||||
Non-residents | $799 | 15.24.290 | ||||
Removal Cremains | $1,500 | Based on Sexton Approval | 15.24.290 | |||
Single grave: | Adult | Infant | ||||
Residents | $1,142 | $685 | Infant: 5' in length or less | 15.24.290 | ||
Non-residents | $1,633 | $1,113 | Infant: 5' in length or less | 15.24.290 | ||
Removal of remains | $3,500 | $2,600 | Based on Sexton Approval | 15.24.290 | ||
Double deep grave: | Lower Grave | |||||
Residents | $1,313 | 15.24.290 | ||||
Non-residents | $1,809 | 15.24.290 | ||||
Removal of remains | $3,700 | Based on Sexton Approval | 15.24.290 | |||
Burial on top of open grave | $114 | 15.24.290 | ||||
Winter fee - grave opening | $343 | 15.24.290 | ||||
Winter fee - cremains | $57 | 15.24.290 | ||||
After Hours Surcharge | ||||||
After 4PM any day | $426 | Per hour | 15.24.290 | |||
Saturday | $457 | Per day | 15.24.290 | |||
Sunday or holiday | $426 | Per hour | 15.24.290 | |||
Removal and lowering | Adult | Infant | ||||
Resident | $4,600 | $1,900 | Based on Sexton Approval | 15.24.290 | ||
Non-resident | $4,600 | $1,900 | Based on Sexton Approval | 15.24.290 | ||
Head Stone Monitoring | ||||||
Ground level | $88 | 15.24.290 | ||||
Upright | $110 | 15.24.290 | ||||
Oversize | $571 | Requires variance process | 15.24.290 |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 18 |
COMMUNITY AND NEIGHBORHOODS (CAN) | |||||||
For questions regarding Community and Neighborhood fees Contact: 801.535.6000 | |||||||
Service | Fee | Additional Information | Section | ||||
Boarding or Securing of Buildings | |||||||
Boarding Administrative Costs | $500 | Plus actual costs, see Section 18.48.100 | 18.48.100 | ||||
Boarding Registration Fee | |||||||
Residential Years 1 & 2 | $3,000 | Per parcel | 18.48.215 | ||||
Nonresidential Years 1 & 2 | $6,000 | Per parcel | 18.48.215 | ||||
Residential Years 3 -5 | $6,000 | Per parcel | 18.48.215 | ||||
Nonresidential Years 3 - 5 | $9,000 | Per parcel | 18.48.215 | ||||
Residential Years 6 or more | $9,000 | Per parcel | 18.48.215 | ||||
Nonresidential Years 6 or more | $14,000 | Per parcel | 18.48.215 | ||||
Boarding registration fee for a contributing structure or landmark site | $14,000 | Per parcel | 18.48.215 | ||||
Other Abatement Administrative Costs | $129 | Plus actual costs | 18.48, 9.36; 21A.20 | ||||
City maintenance of building | $219 | Annual, plus actual costs, see Section 18.48.250 | 18.48.250 | ||||
Building Code Enforcement | |||||||
Violation of Title 18 (except Ch. 18.50 or Stop Work Order) | $100 | 18.24.030 | |||||
Violation of Stop Work Order | $250 | 18.24.040.B | |||||
Violation of Ch. 18.50 | |||||||
Substandard condition | $50 | 18.50.100.D | |||||
Hazardous condition | $100 | 18.50.100.D | |||||
Imminent danger condition | $250 | 18.50.100.D | |||||
Appeal of a decision to the board of appeals and examiners | $285 | Additional fee for required public notices. | 18.12.020 | ||||
Building Permits | |||||||
Total project valuation: | |||||||
$0.01 - $500.00 | $54.55 | 18.32.035 | |||||
$500.01 - $2,000.00 | $54.55 for the first $500 plus $4 for each additional $100 or fraction thereof, to and including $2,000 | 18.32.035 | |||||
$2,000.01 - $25,000.00 | $114.55 for the first $2,000 plus $20 for each additional $1,000 or fraction thereof, to and including $25,000 | 18.32.035 | |||||
$25,000.01 - $50,000.00 | $574.55 for the first $25,000 plus $14 for each additional $1,000 or fraction thereof, to and including $50,000 | 18.32.035 | |||||
$50,000.01 - $100,000.00 | $924.55 for the first $50,000 plus $10 for each additional $1,000 or fraction thereof, to and including $100,000 | 18.32.035 | |||||
$100,000.01 - $500,000.00 | $1,424.55for the first $100,000 plus $8 for each additional $1,000 or fraction thereof, to and including $500,000 | 18.32.035 | |||||
$500,000.01 - $1,000,000.00 | $4,624.55 for the first $500,000 plus $7 for each additional $1,000 or fraction thereof, to and including $1,000,000 | 18.32.035 | |||||
$1,000,000.01 and up | $8,124.55 for the first $1,000,000 plus $5 for each additional $1,000 or fraction there of and above | 18.32.035 | |||||
Demolition Landscaping Waivers | |||||||
Property inspection | $163 | If waiver is denied, this fee will be refunded | 18.64.030 | ||||
Pre-demolition salvage permit | 20% of demolition fee | See Section 18.64.080 | 18.64.030 | ||||
Demolition Permit Application Fees |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 19 |
Building floor area: | |||||||
5 - 2,000 sq. feet | $98 | 18.64.030 | |||||
2,001 - 4,000 sq. feet | $114 | 18.64.030 | |||||
4,001 - 6,000 sq. feet | $131 | 18.64.030 | |||||
6,001 - 8,000 sq. feet | $179 | 18.64.030 | |||||
8,001 - 10,000 sq. feet | $196 | 18.64.030 | |||||
10,001 - 12,000 sq. feet | $244 | 18.64.030 | |||||
12,001 - 14,000 sq. feet | $293 | 18.64.030 | |||||
14,001 - 16,000 sq. feet | $342 | 18.64.030 | |||||
16,001 - 18,000 sq. feet | $391 | 18.64.030 | |||||
18,001 - 20,000 sq. feet | $432 | 18.64.030 | |||||
20,001 - 22,000 sq. feet | $489 | 18.64.030 | |||||
22,001 - 24,000 sq. feet | $554 | 18.64.030 | |||||
24,001 - 26,000 sq. feet | $603 | 18.64.030 | |||||
26,001 - 28,000 sq. feet | $668 | 18.64.030 | |||||
28,001 - 30,000 sq. feet | $733 | 18.64.030 | |||||
30,001 - 32,000 sq. feet | $790 | 18.64.030 | |||||
Square feet over 32,000 | $16 | Per 500 sq. ft. unit | 18.64.030 | ||||
Electrical Permits (Commercial and Industrial) | |||||||
Minimum fee (up to $1,600) | $39 | 18.36.120 | |||||
Base Fee | $57 | 18.36.100 | |||||
New service or change of service | Alterations or repairs of 600 volt or less capacity service entrance equipment | 18.36.120 | |||||
Up to 100 amps | $39 | 18.36.120 | |||||
101 amps to 200 amps | $39 | 18.36.120 | |||||
Each additional 100 amps or fraction | $6 | 18.36.120 | |||||
Motor generator installation for emergency or standby power | |||||||
Up to 500 kVa | $141 | 18.36.120 | |||||
Above 500 kVa | $209 | 18.36.120 | |||||
Alternate fee schedule - Bids Under $100,000 | |||||||
Electrical work up to $10,000 | .0166 of total valuation | When a fee cannot be computed on the standard schedules, it shall be computed as outlined in this section up to, but not exceeding, $100,000 | 18.36.120 | ||||
Electrical work between $10,001 and $100,000 | Bid minus $10,000 multiplied by .0039 + 136 | When a fee cannot be computed on the standard schedules, it shall be computed as outlined in this section up to, but not exceeding, $100,000 | 18.36.120 | ||||
Electrical Permits - Work Exceeding $100,000 | |||||||
Work exceeding $100,000 but less than $250,000 | $587 | Plus $0.4252 of 1% over $100,000 | 18.36.130 | ||||
Work exceeding $250,000 | $1,368 | Plus $0.1452 of 1% all work at $250,000 or more | 18.36.130 | ||||
Electrical Permits (Residential) | |||||||
Base Fee | $57 | 18.36.100 | |||||
Minor remodel and additional circuits | $39 | 18.36.100 | |||||
Service change with 1 or 2 new circuits | $39 | 18.36.100 | |||||
Service change or alteration | $39 | 18.36.100 | |||||
Homeowner electrical remodel permit | $47 | 18.36.100 | |||||
New single family dwelling | |||||||
Up to 1,500 sq. feet | $0.0582 | Per square foot | 18.36.100 | ||||
Above 1,500 sq. feet | $0.0398 | Per square foot | 18.36.100 | ||||
Total renovation of electrical systems | |||||||
Existing single family dwelling | $39 | 18.36.100 | |||||
Multi-unit apartment building* | |||||||
1 or 2 units | $39 | 18.36.100 | |||||
3rd and 4th units | $16 | Each | 18.36.100 | ||||
Additional units including house meter | $8 | Each | 18.36.100 | ||||
Note: Projects including multi buildings or row houses shall be computed for each building or house separately. |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 20 |
*New Multi-unit apartments (excluding transient occupancies, such as hotel or motel which are classified as commercial) | |||||||
First 3 unit | $0.066 | Per sq. foot | 18.36.100 | ||||
4 - 10 units | $16 | Each | 18.36.100 | ||||
11 units and above | $8 | Each | 18.36.100 | ||||
Projects including multiple buildings and/or row houses | Computed for each building or house separately | ||||||
Power panel with no issue for single occupancy buildings | $15 | 18.36.100 | |||||
Power to panel for construction purposes only | |||||||
60 Days | 30 Day Extension | ||||||
No issue fee | $29 | $10 | 18.36.100 | ||||
Individual apartments in an apartment building, or condominium units nor for occupancy | $6 | Each additional meter | 18.36.100 | ||||
Electrical Temporary Metering | |||||||
Up to 100 amp load capacity | $25 | 18.36.100 | |||||
Each additional, or part thereof, 100 amp capacity | $6 | 18.36.100 | |||||
Fencing Permit | $46 | 18.36.100 | |||||
Fire Extinguishing Systems | |||||||
Base Fee | $57 | 18.36.100 | |||||
Automatic fire sprinklers in range hood or vent | $8 | 18.56.040 | |||||
Dry standpipe | $20 | Plus $3 each outlet | 18.56.040 | ||||
Fire pump | $59 | Each | 18.56.040 | ||||
Fire sprinkler systems: | |||||||
1 to 100 sprinkler heads | $49 | 18.56.040 | |||||
Over 100 sprinkler heads | $49 | Plus $0.1398 per head | 18.56.040 | ||||
Flow switch | $10 | Each | 18.56.040 | ||||
Hood extinguishing system | $49 | Each | 18.56.040 | ||||
Hydrants on private property | $16 | Each | 18.56.040 | ||||
Tamper valve | $10 | Each | 18.56.040 | ||||
Underground piping | $25 | 18.56.040 | |||||
Water storage tank | $20 | Each | 18.56.040 | ||||
Wet standpipe | $20 | Each, plus $2 each hose cabinet | 18.56.040 | ||||
Housing Inspections | |||||||
Existing single-family dwelling | Not more than $27 | 18.48.030 | |||||
Additional dwelling units on premises | $15 | Each | 18.48.030 | ||||
Housing Stability | |||||||
Service | Fee | Additional Information | Section | ||||
Rehabilitation Loan | $441 | 2.61.030 | |||||
First Time Home Buyer Loan | $504 | 2.61.030 | |||||
Foreclosure | $630 | 2.61.030 | |||||
Returned Check or EFT Transfer | $20 | 2.61.030 | |||||
Mortgage Insurance | 0.5% - 1.0% | Depending on loan fund sourcing | 2.61.030 | ||||
First Time Home Buyer Repurchase | $158 | 2.61.030 | |||||
Loan Subordination | $66 | 2.61.030 | |||||
Mechanical Permits | |||||||
Base Fee | $57 | 18.52.050 | |||||
Installation or relocation of each forced air or gravity type furnace or burner | Including ducts or vents attached to such appliance | ||||||
Up to and including 200,000 BTU.h | $29 | 18.52.050 | |||||
Over 200,000 BTU.h up to and including 300,000 BTU.h | $41 | 18.52.050 | |||||
Over 300,000 BTU.h up to an including 1,000,000 BTU.h | $65 | 18.52.050 | |||||
Over 1,000,000 BTU.h | $65 | 18.52.050 | |||||
Each additional 500,000 BTU.h or part thereof | $23 | 18.52.050 | |||||
Installation or relocation of each floor furnace, including vent | $18 | 18.52.050 | |||||
Installation or relocation of each suspended, recessed wall or floor mounted unit heaters | |||||||
Up to and including 200,000 BTU.h | $23 | 18.52.050 | |||||
Over 200,000 BTU.h up to and including 300,000 BTU.h | $41 | 18.52.050 | |||||
Over 300,000 BTU.h | $65 | 18.52.050 | |||||
For the installation, relocation or replacement of each appliance vent installed and not included on an appliance permit | $18 | 18.52.050 | |||||
For the repair of, alteration of or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit or each heating, cooling, absorption or evaporative cooling system | Including alteration of controls regulated by this code |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 21 |
Up to $1,000 contract value | $41 | 18.52.050 | |||||
Greater than $1,000 contract value | $100 | 18.52.050 | |||||
$29 | 18.52.050 | ||||||
Installation or relocation of boilers: | |||||||
Over 200,000 BTU.h to and including 300,000 BTU.h | $41 | Each | 18.52.050 | ||||
Over 300,000 BTU.h to and including 1,000,000 BTU.h | $65 | Each | 18.52.050 | ||||
Over 1,000,000 BTU.h to and including 2,000,000 BTU.h | $100 | Each | 18.52.050 | ||||
Over 2,000,000 BTU.h | $100 | Plus $17 for each additional 500,000 BTU.h or part thereof | 18.52.050 | ||||
Air handling unit | |||||||
To and including 10,000 cubic feet per minute, including ducts attached thereto | $29 | This fee shall not apply to air handling unit which is a portion of a factory assembled cooling unit, evaporative cooler or absorption unit for which permit is required elsewhere in this code. | 18.52.050 | ||||
Over 10,000 cubic feet per minute | $65 | 18.52.050 | |||||
Evaporative cooler other than portable type | |||||||
Up to 6,500 cubic feet per minute | $23 | Each | 18.52.050 | ||||
More than 6,500 cubic feet per minute | $65 | Each | 18.52.050 | ||||
Ventilation fan connected to a single duct | $18 | 18.52.050 | |||||
Ventilation system which is not a portion of any heating or air conditioning system authorized by a permit | $18 | 18.52.050 | |||||
Installation of each hood which is served by mechanical exhaust, including the ducts for each unit | $41 | 18.52.050 | |||||
Installation or relocation of domestic type incinerator | $23 | Each | 18.52.050 | ||||
Installation or relocation of commercial or industrial type incinerator | $65 | Each | 18.52.050 | ||||
For each appliance or piece of equipment regulated by this code but not classed in other appliance categories, or for which no other fee is listed in this code | $23 | 18.52.050 | |||||
Installation or relocation of cooling towers: | |||||||
1 1/2 horsepower up to and including 4 horsepower or tons | $29 | 18.52.050 | |||||
4 1/2 horsepower up to and including 10 horsepower or tons | $40 | 18.52.050 | |||||
11 horsepower or tons and over | $76 | 18.52.050 | |||||
For the purpose of calculating the rate in tons, the tonnage shall be considered not less than then the following: | |||||||
a. Total maximum BTU peer hour of capacity of the installation divided by 12,000 or | |||||||
b. The nameplate horsepower of any compressor prime mover unit or for any air conditioning installations; or | |||||||
c. 2/3 of the nameplate horsepower subsection A18b of this section, for any refrigeration installation | |||||||
Installation or relocation of compressor or absorption systems | |||||||
1 1/2 horsepower to and including 4 horsepower or tons | $23 | 18.52.050 | |||||
4 horsepower to and including 5 horsepower or tons | $27 | 18.52.050 | |||||
5 horsepower to and including 6 horsepower or tons | $35 | 18.52.050 | |||||
6 horsepower to and including 7 horsepower or tons | $39 | 18.52.050 | |||||
7 horsepower to and including 8 horsepower or tons | $43 | 18.52.050 | |||||
8 horsepower to and including 9 horsepower or tons | $47 | 18.52.050 | |||||
9 horsepower to and including 10 horsepower or tons | $53 | 18.52.050 | |||||
Each additional horsepower or tons | $4 | 18.52.050 | |||||
Other appliances* | $23 | 18.52.050 | |||||
*Fee for each appliance or piece of equipment regulated by this code but not classed in other appliance categories, or for which no other fee is listed in Section 18.52.050 | |||||||
Mobile Home Park Construction Permits | |||||||
General building permit - pads, patio slabs, metal sheds, curb, gutter, drives, piers, sidewalks, fence, wall. | $3 | Per mobile home space | 18.76.050 | ||||
Inspection of gas line/meter for utility clearance purposes | $23 | 18.56.040 | |||||
Electric meter stands or pedestals | |||||||
First 10 | $7 | Each | 18.76.050 | ||||
Next 90 | $4 | Each | 18.76.050 | ||||
Over 100 | $3 | Each | 18.76.050 | ||||
Park plumbing system, including sewer and water risers | $7 | Per mobile home space | 18.76.050 | ||||
Permanent buildings, swimming pools, etc. | Regular and normal fee schedule | 18.76.050 | |||||
Fire hydrants within property lines | $7 | Each hydrant | 18.76.050 | ||||
News Racks |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 22 |
Permit application | $200 | 14.36.080 | |||||
News Rack Fee | $7 | Per news rack in the public right-of-way | |||||
News Rack Relocation Fee | $14 | Per news rack, per relocation | |||||
Removal of Non-Compliant News Rack | $386 | Per news rack | |||||
Storage of Non-Compliant News Rack | $7 | Per news rack, per day at a city facility | |||||
Certificate filing fee | $7 | Per news rack | 14.36.110 | ||||
Plan Review Fees | |||||||
Plan review fee | 65% of building permit fee | 18.32.035 | |||||
Hourly Plan Review Fee | $146 | Deferred Plan Review Items after permit issuance, Project Changes after permit issuance, Plan reviews for permits that aren't a "Building Permit" (Mechanical, Electrical, Fire Alarm, Fire Suppression, etc.) | 18.32.035 | ||||
Expedited building plan review | Twice the cost of a standard plan review fee | See Section 18.20.050 | 18.20.050 | ||||
Identical Plan Review | 30% of the cost of standard plan review fee | Utah Code 10-9a-510 effective May 7, 2025, HB 368 | 18.20.020 | ||||
Condominium preliminary review | $432 | Per plan, plus $11 per unit | 21A.56.040 | ||||
Condominium final review | $283 | Per plan, plus $11 per unit | 21A.56.040 | ||||
Renewing expired plan review | One half the original plan review fee, maximum of $1,565 plus $177 per hour for review necessitated by changes in codes and ordinances, two hour minimum. | See section 18.20.110 | 18.20.110 | ||||
Plumbing Permits | |||||||
Base fee | $57 | 18.56.040 | |||||
Inspection of gas line/meter for utility clearance purposes | $23 | 18.56.040 | |||||
Air conditioning device discharging into the building drainage system | $10 | Each | 18.56.040 | ||||
Change, alteration or replacement of soil, waste or vent pipe | $8 | 18.56.040 | |||||
Change or repair of a drain, waste, vent (DWV) system | $12 | Each | 18.56.040 | ||||
Grey water system | $20 | Each | 18.56.040 | ||||
Lawn sprinkler control valve on devices | $10 | Each | 18.56.040 | ||||
Medical gas piping | $20 | Each | 18.56.040 | ||||
Plumbing fixture or trap roughed in for installation or relocation | $8 | Each | 18.56.040 | ||||
Refrigeration drain and each safe drain discharged directly or indirectly into the building drain | $8 | Each | 18.56.040 | ||||
Roof drain | $8 | Each | 18.56.040 | ||||
Roof drain installed inside building | $8 | Each | 18.56.040 | ||||
Settling tank or grease trap | $56 | Each | 18.56.040 | ||||
Soda fountain carbonator | $16 | Each | 18.56.040 | ||||
Store, restaurant or home appliance or device connected to the culinary water supply and/or building drainage system | $8 | Each | 18.56.040 | ||||
Vacuum breaker or backflow device on tanks, etc | $10 | Each | 18.56.040 | ||||
Water heater | $16 | Each | 18.56.040 | ||||
Water softener or conditioning device | $16 | Each | 18.56.040 | ||||
Re - Inspection Fee | $129 | 18.20.200 | |||||
Real Estate | |||||||
Vending Cart Application | $34 | Not including Mobile Ice cream vendors | 5.65.030 | ||||
Vending License - Mobile Ice Cream Vendors | $34 | 5.64.670 | |||||
Solar Panel Permit Fee | |||||||
System Size in kW | Fee | ||||||
0 - 5 kW | $258 | ||||||
6 - 10 kW | $451 | ||||||
11 - 50 kW | $515 | ||||||
51 - 100 kW | $1,159 | ||||||
Sidewalk Entertainer and Artist Registration | $43 | Annual | 14.38.100 | ||||
Sidewalk Vending Cart - Revocable Land Use Fee | $450 | Annual | 05.65.030 | ||||
Temporary Metering | |||||||
Up to 100 amp load capacity | $25 | 18.36.110 | |||||
Each additional, or part thereof, 100 amp capacity | $6 | 18.36.110 | |||||
Temporary Re-locatable Office Buildings | |||||||
Installation permit | $110 | Per unit | 18.84.070 | ||||
Interior inspection | $110 | Per unit | 18.84.070 | ||||
Unity Center - Rental rates are for 6 hour consecutive period, unless otherwise noted. For questions regarding the Unity Center contact: 801.535.6533 |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 23 |
Staffing Charge | $34 | Per hour over 6 hours | 3.50.080 | ||||
Janitorial Rate | $50 | Per hour, 1 hour minimum | 3.50.080 | ||||
Main lobby/gallery | |||||||
Business/individuals | $368 | Not residents of Glendale or Poplar Grove | 15.16.090 | ||||
Glendale or Poplar Grove residents | $258 | Per group | 15.16.090 | ||||
City/Community activities | No charge | Including community council meetings | 15.16.090 | ||||
Theater - Storage or theater dark days during multi-day rentals incur the 6 hour rate per day | |||||||
Business/individuals | $289 | Not residents of Glendale or Poplar Grove | 15.16.090 | ||||
Glendale or Poplar Grove residents | $181 | Per group | 15.16.090 | ||||
City/Community activities | No charge | Including community council meetings | 15.16.090 | ||||
Lobby & Theater | |||||||
Business/individuals | $621 | Not residents of Glendale or Poplar Grove | 15.16.090 | ||||
Glendale or Poplar Grove residents | $515 | Per group | 15.16.090 | ||||
City/Community activities | No charge | Including community council meetings | 15.16.090 | ||||
Full facility rental | $736 | 15.16.090 | |||||
Classroom | $29 | Per hour | 15.16.090 | ||||
Rental Reservation and Damage deposits | |||||||
Up to 75 participants | $147 | 15.16.090 | |||||
More than 75 participants | $368 | 15.16.090 | |||||
Equipment rental and service rates | |||||||
Chair riser setup | $368 | 15.16.090 | |||||
Stage setup | $221 | 15.16.090 | |||||
Table setup | $7 | Per table | 15.16.090 | ||||
Chair setup | $1 | Per chair | 15.16.090 | ||||
YouthCity Programs: After School and Summer Programs | |||||||
Income Qualifications | Amount per participant | ||||||
Residents of Salt Lake City Household income:*** | After School Program* | Summer Program** | |||||
$10,000 or less per year | $15 | $15 | 15.16.090 | ||||
More than $10,000 per year but less than or equal to 42% of the area median income, or with free lunch status | $52 | $74 | 15.16.090 | ||||
More than 42% but less than or equal to 60% of the area median income, or with reduced lunch status | $110 | $147 | 15.16.090 | ||||
More than 60% but less than or equal to 80% of the area median income | $184 | $221 | 15.16.090 | ||||
More than 80% but less than or equal to 100% of the area median income | $221 | $331 | 15.16.090 | ||||
More than 100% of the area median income | $294 | $578 | 15.16.090 | ||||
Non-residents of Salt Lake City Household income:*** | After School Program* | Summer Program** | |||||
Regardless of income or lunch status | $294 | $577 | 15.16.090 | ||||
*After school program fees will be charged on a monthly basis, with the exception of the months with 12 days or less of scheduled programming which shall be half of the monthly fee, and months with 5 days or less of scheduled programming which shall be one quarter of the monthly fee, as determined by the family median income. | |||||||
**Summer program fees will be charged on a session basis, as determined by the family median income. | |||||||
***For purpose of the after school and the summer program, area median income shall be determined based on the federal housing and urban development guidelines for the Salt Lake City metropolitan statistical area. |
Zoning Fees | |||||||||||||||
Service | Fee | Additional Information | Section | ||||||||||||
Determination of Nonconforming Use | $244 | 21A.38.025.4 | |||||||||||||
Administrative Interpretation | $81 | Plus $61 per hour for research after the first hour | 21A.12.040.A.6 | ||||||||||||
Alley Vacation/Closure | $326 | Fee waiver available if adequate signatures are obtained. See also fee for required public notices (21A.10.010.E) | 14.52.030. A.5 | ||||||||||||
Alternative Parking | |||||||||||||||
Residential | $489 | 21A.52.040 .A.3 | |||||||||||||
Nonresidential | $896 | 21A.52.040 .A.3 | |||||||||||||
Amendments | |||||||||||||||
Master plan | $1,222 | Plus $121 per acre in excess of one acre. See also fee for required public notices (10.9a.204). | Utah Code Annoted 10.9A.510 | ||||||||||||
Zoning map amendment | $1,304 | Plus $121 per acre in excess of one acre. See also fee for required public notices (21A.10.010.E). | 21A.50.040.B | ||||||||||||
Zoning text amendment | $1,304 | See also fee for required public notices (21A.10.010.E) | 21A.50.040.B | ||||||||||||
Annexation | $1,630 | See also fee for required public notices (21A.10.010.E) | Utah Code Annoted 10.2.401.5 | ||||||||||||
Appeal of a Decision |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 24 |
Administrative decision | $326 | See also fee for required public notices (21A.10.010.E) | 21A.16.030.B | ||||||||||||
Historic Landmark Commission | $326 | See also fee for required public notices (21A.10.010.E) | 21A.16.030.B | ||||||||||||
Planning Commission | $326 | See also fee for required public notices (21A.10.010.E) | 21A.16.030.B | ||||||||||||
Appearance Before the Zoning Enforcement Hearing Office | |||||||||||||||
First scheduled hearing | No charge | 21A.20.90 | |||||||||||||
Second scheduled hearing | $81 | 21A.20.90 | |||||||||||||
Billboard Construction or Demolition including the demolition of a non-conforming billboard | $326 | 21A.46.160.D.3 & 21A.46.160.L.2 | |||||||||||||
Conditional Building and Site Design Review | $978 | Plus $121 per acre in excess of one acre. See also fee for required public notices (21A.10.010.E). | 21A.59.070.B | ||||||||||||
Conditional Use | $978 | See also fee for required public notices (21.A.10.010.E). | 21A.54.060.C | ||||||||||||
Condominium | |||||||||||||||
Preliminary | $652 | Plus $37 per unit. See also fee for required public notices (21.A.10.010.E). | 20.56.40.B | ||||||||||||
Final | $489 | Plus $24 per unit. | 20.56.40.B | ||||||||||||
Declaration of Surplus Real Property | $489 | 2.58.040 | |||||||||||||
Historic Landmarks Commission Review (Application) | |||||||||||||||
Major Alterations of a principal building | $100 | See also fee for required public notices (21A.10.010.E) | 21A.34.020 | ||||||||||||
New construction of a principal building | $2,982 | See also fee for required public notices (21A.10.010.E) | 21A.34.020 | ||||||||||||
Demolition of a contributing principal building | $2,406 | See also fee for required public notices (21A.10.010.E) | 21A.34.020 | ||||||||||||
Relocation of a contributing principal building | $326 | See also fee for required public notices (21A.10.010.E) | 21A.34.020 | ||||||||||||
Reduction to boundaries of the H Historic Pres. Overlay District | $2,999 | See also fee for required public notices (21A.10.010.E) | 21A.51.050 | ||||||||||||
Revocation of a Landmark Site | $2,999 | See also fee for required public notices (21A.10.010.E) | 21A.51.050 | ||||||||||||
Economic Hardship | $2,050 | Plus $200/hour up to $20,000. See also fee for required public notices (21A.10.010.E) | 21A.34.020 | ||||||||||||
Home Occupation | |||||||||||||||
Non-conditional | No charge | Fee could be assessed in future as per ordinance | 21A.36.030 | ||||||||||||
Conditional | No charge | Fee could be assessed in future as per ordinance | 21A.36.030 | ||||||||||||
Outdoor Dining | |||||||||||||||
Outdoor Dining Application | $34 | 21A.40.065 | |||||||||||||
Outdoor Dining Permit Fee (1-5 tables) | $137 | 21A.40.065 | |||||||||||||
Outdoor Dining Permit Fee (6 or more tables) | $205 | 21A.40.065 | |||||||||||||
Planned Development | $977 | Plus $121 per acre in excess of (1) acre. See also fee for required public notices (21A.10.010.E) | 21A.55 | ||||||||||||
Signs | |||||||||||||||
Permit fee for signs | Based on the adopted Building Permit Fee Schedule | 21A.46.030 | |||||||||||||
Plan checking fee | $0.15 | Of building permit value | 21A.46.030 | ||||||||||||
Inspection tag | $16 | 21A.46.030 | |||||||||||||
Site Development Permit | $326 | Plus $61 per acre in excess of one (1) acre | 18.28.040.E | ||||||||||||
Street Closure | $489 | See also fee for required public notices. | 2.58.040 | ||||||||||||
Subdivision Amendments | $489 | Plus $121 per lot. See also fee for required public notices (20.36) | 20.04.120 | ||||||||||||
Subdivision Preliminary Plat | $489 | Plus $121 per lot. See also fee for required public notices (20.36) | 20.04.120 | ||||||||||||
Subdivision Final Plat | $978 | Plus $121 per lot. | 20.04.120 | ||||||||||||
Subdivision Vacations | $489 | See also fee for required public notices (20.36) | 20.04.120 | ||||||||||||
Engineering Review and Inspection Fee | 5% of the 1st $100,000 of public improvements & 2% for the amount above $100,000 | 20.04.120 | |||||||||||||
Subdivision Lot Line Adjustment | $324 | 20.04.120 | |||||||||||||
Subdivision Consolidating Lots | $312 | 20.04.120 | |||||||||||||
Temporary Uses | $326 | 21A.42.060.B | |||||||||||||
Zoning Variance | $489 | See also fee for required public notices (21A.10.010.E) | 21A.18.040.B | ||||||||||||
As per applicable sections of the City and / or State Code, a fee will be assessed for required public notices. This may include sending notice by 1st class U.S. Mail to property owners within a certain radius of the subject property and / or advertising required public hearings in a newspaper of general circulation. A fee for each required public hearing will be assessed. The noticing fee is authorized through the following sections of the Zoning Ordinance and State Law: Salt Lake City Code 21A.10.E and Utah State Code Annotated 10.9a.204 and 510 | |||||||||||||||
Amended 06/10/2025 by Ord. 2025 - 34 | Page 25 |
ECONOMIC DEVELOPMENT | |||||
For questions regarding Economic Development fees Contact: 801.535.7200 | |||||
Service | Fee | Additional Information | Section | ||
Economic Development Loan Application | $120 | Each | 03.16.005 |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 26 |
ENGINEERING | |||||
For questions regarding Engineering Fees Contact: 801.535.6159 | |||||
Service | Fee | Additional Information | Section | ||
Excavation Permits | |||||
Shallow Trenching | $0.29 | Per linear foot | 14.32.400 | ||
Minimum charge | $2,900 | 14.32.400 | |||
Hard surfaced | $0.44 | Per sq. foot | 14.32.400 | ||
Minimum charge | $225 | April 1 - November 15 | 14.32.400 | ||
Minimum charge | $300 | November 16 - March 31 | 14.32.400 | ||
Soft Surfaced | $0.30 | Per sq. foot | 14.32.400 | ||
Minimum charge | $150 | April 1 - November 15 | 14.32.400 | ||
Minimum charge | $175 | November 16 - March 31 | 14.32.400 | ||
Permit within a restricted area | Fees double | See Section 14.32.400 A3 | 14.32.400 | ||
Multiple Utility Excavation Permits | |||||
Hard surfaced | |||||
Per multiple | $179 | April 1 - November 15 | 14.32.400 | ||
Per multiple | $264 | November 16 - March 31 | 14.32.400 | ||
Pothole/excavation < 10 sq. ft. (per each) | $42 | April 1 - November 15 | 14.32.400 | ||
Pothole/excavation < 10 sq. ft. (per each) | $53 | November 16 - March 31 | 14.32.400 | ||
Test holes (per each) | $2 | 14.32.400 | |||
Soft Surface | |||||
Per multiple | $109 | April 1 - November 15 | 14.32.400 | ||
Per multiple | $121 | November 16 - March 31 | 14.32.400 | ||
Pothole/excavation < 10 sq. ft. (per each) | $22 | April 1 - November 15 | 14.32.400 | ||
Pothole/excavation < 10 sq. ft. (per each) | $32 | November 16 - March 31 | 14.32.400 | ||
Test holes (per each) | $1 | 14.32.400 | |||
Certified Address | $13 | 14.08.040 | |||
Poles and Anchors | $62 | Each pole, concrete pedestal or anchor | 14.32.400 | ||
Public Survey Monuments | $88 | Monument (per each) | 14.10.040 | ||
Pre-Notification Mailer | First Class Postage | 14.32.036 | |||
Public Way Improvements | |||||
Curb and gutter | $3 | Per linear foot | 14.32.405 | ||
Sidewalk, driveway approach | $0.45 | Per sq. foot | 14.32.405 | ||
Minimum charge | $243 | April 1 - November 15 | 14.32.405 | ||
Minimum charge | $303 | November 16 - March 31 | 14.32.405 | ||
In-kind | No charge | See section 14.32.405 D | 14.32.405 | ||
Public Way Obstruction Permits | |||||
Short term (One Week) | |||||
Dumpster/pod | $53 | Each, per Week (Construction barricades) | 14.32.410 | ||
Sidewalk Canopy | $21 | Per Week (Construction barricades) | 14.32.410 | ||
Sidewalk closure (Detour) | $210 | Per Week (Construction barricades) | 14.32.410 | ||
Sidewalk Diversion | $35 | Per Week (Construction barricades) | 14.32.410 | ||
Vehicular Travel Lane closure | $300 | Per Week (Construction barricades) | 14.32.410 | ||
Bike Lane closure | $125 | Per Week (Construction barricades) | 14.32.410 | ||
Long term (One Month) | |||||
Dumpster/pod | $212 | (Construction barricades) | 14.32.410 | ||
Sidewalk Canopy | $85 | Each, per month (Construction barricades) | 14.32.410 | ||
Sidewalk closure (Detour) | $840 | Per month (Construction barricades) | 14.32.410 | ||
Sidewalk Diversion | $140 | Per month (Construction barricades) | 14.32.410 | ||
Vehicular Travel Lane closure | $1,200 | Per month (Construction barricades) | 14.32.410 | ||
Bike Lane closure | $500 | Per month (Construction barricades) | 14.32.410 | ||
Small Wireless Facility Fees | |||||
Application fees | 14.56.060 | ||||
Small cell facility to collocate a small wireless facility on an existing or replacement utility pole | $100 | Per wireless facility | 14.56.060 | ||
Install, modify or replace a utility pole associated with a small wireless facility, where permitted under Utah Code Section 54-21-204, or its successor | $250 | Per wireless facility | 14.56.060 | ||
Install, modify or replace a utility pole associated with a small wireless facility, where NOT permitted under Utah Code Section 54-21-204, or its successor | $1,000 | Per wireless facility | 14.56.060 | ||
Collation Rate | As set forth in Utah Code Section 54-21-504 | 14.56.070 | |||
Street Banners on Utility Poles | $61 | Application outside of boundaries of a coordinated street banner program | 21A.46.170 |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 27 |
FIRE | |||||
For questions regarding Fire Fees Contact: 801.535.4150 | |||||
Service | Fee | Additional Information | Section | ||
Amusement Building Permit | $427 | Annual | 2.12.040 | ||
Cost Recovery | |||||
Hazardous material emergency | Actual cost | See Section 9.44.030 | 9.44.030 | ||
Fire emergency | Actual cost | See Section 9.48.030 | 9.48.030 | ||
Distributed Antenna System Inspection Fee | $253 | Includes 1 hour of plan review and 1 hour of post- construction inspection. | 02.12.040 | ||
$155 | Each additional hour of plan review. | 02.12.040 | |||
$98 | Each additional hour of inspection. | 02.12.040 | |||
Emergency Demolition | Actual cost | The city's cost of demolition. | 18.64.160 | ||
Emergency Management | |||||
Community Emergency Response Team (CERT) Class | $35 | Salt Lake City Resident (includes CERT bag) | 3.02.010 | ||
$70 | Non-Salt Lake City Resident (includes CERT bag) | 3.02.010 | |||
Amateur (HAM) Radio Operators Class | $30 | Manual Required (Included in $30 class fee) | 3.02.010 | ||
Emergency Medical Services Charges | |||||
EMS Billing | $68 | Per hour | 2.12.040 | ||
EMS Equipment Surcharge | $68 | Per shift (up to 12 hours) | 2.12.040 | ||
Medical Report | $21 | 2.12.040 | |||
Healthcare Provider CPR | $68 | 2.12.040 | |||
Heartsaver CPR Courses | $41 | 2.12.040 | |||
Heartsaver CPR/AED Cards & Student Manual | $20 | Manual Required ($3) with Card ($17) | 2.12.040 | ||
Heartsaver CPR/AED BLS Provider - Card & Student Manual | $15 | Manual Required ($13) with Card ($2) | 2.12.040 | ||
Exhibit and Trade Show Permits | |||||
0 - 5,000 sq. feet | $287 | Single event | 2.12.040 | ||
5,001 - 10,000 sq. feet | $347 | Single event | 2.12.040 | ||
10,001 - 25,000 sq. feet | $464 | Single event | 2.12.040 | ||
25,001 - 50,000 sq. feet | $574 | Single event | 2.12.040 | ||
50,001 - 80,000 sq. feet | $677 | Single event | 2.12.040 | ||
80,001 - 125,000 sq. feet | $787 | Single event | 2.12.040 | ||
125,001 - 200,000 sq. feet | $898 | Single event | 2.12.040 | ||
Each additional 20,000 sq. feet above 200,000 | $140 | Single event, in addition to $898 | 2.12.040 | ||
Explosive Permits | |||||
Fireworks Vendor | $684 | Permit for stores/tents/selling fireworks | 2.12.040 | ||
Fireworks | $714 | Public display outdoors | 2.12.040 | ||
Blasting | $934 | Annual | 2.12.040 | ||
Filming of Fire Engines | $364 | Per hour (includes 1 Fire Apparatus and up to 2 Fire Personnel) | 2.12.040 | ||
Fire System and Equipment Installation Permit | $140 | Fee assessed for each hour to perform inspection during each phase of installation | 2.12.040 | ||
Fire Watch | $62 | Per hour | 2.12.040 | ||
After Hour Fire Watch Rate | $82 | Per hour | 2.12.040 |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 28 |
Hazardous Materials Permits | |||||
Minimal dispensing, use or storage | $287 | Annual / Solids: <500 lbs. Compressed gas: <200 cu. ft. Oxygen: <504 cu. ft. Liquids: <55 gal. | 2.12.040 | ||
Backup generator systems | $213 | Annual | 2.12.040 | ||
Storage quantities exceeding minimal storage | $353 | Annual | 2.12.040 | ||
Dispensing or use | $574 | Annual, quantities exceeding minimum use or dispensing | 2.12.040 | ||
Body shop/garage | $287 | Annual, under 5,000 sq. feet | 2.12.040 | ||
Production and processing | $714 | Annual | 2.12.040 | ||
Gas stations | $250 | Annual | 2.12.040 | ||
Tire Storage - more than 2,500 Cubic Feet | $286 | Annual | 2.12.040 | ||
Wrecking/Salvage Yards - Not including compressed gases, flammable and combustible liquids, hot works, spray painting. | $143 | Annual | 2.12.040 | ||
Lumber Yards - Storage or processing of lumber exceeding 100,000 board feet. | $229 | Annual | 2.12.040 | ||
Pallet Storage - Indoor or Outdoor (over 2,000 sq ft) | $200 | Annual | 2.12.040 | ||
Recycling Facilities | $229 | Annual | 2.12.040 | ||
CO2 Bulk Storage - 100 lbs. or more | $143 | Annual | 2.12.040 | ||
Dust Production Operation - (excluding woodworking) | $143 | Annual | 2.12.040 | ||
Tank installation, alteration, abandonment, removal or disposal: | Single event | ||||
Up to 3 tanks per site | $574 | (minimum per single event) | 2.12.040 | ||
Each additional tank | $140 | 2.12.040 | |||
High Rise Permits | |||||
7 - 12 floors | $714 | Annual | 2.12.040 | ||
13 - 18 floors | $861 | Annual | 2.12.040 | ||
19 - 24 floors | $1,001 | Annual | 2.12.040 | ||
25 - 30 floors | $1,148 | Annual | 2.12.040 | ||
31 - 36 floors | $1,295 | Annual | 2.12.040 | ||
37 - 42 floors | $1,435 | Annual | 2.12.040 | ||
Over 42 floors | $140 | Annual; in addition to $1,435, per each additional 6 floors | 2.12.040 | ||
Hospitals | $714 | Annual | 2.12.040 | ||
Hot Works Operation Permit | $213 | Annual | 2.12.040 | ||
National Fire Incident Report (NFIR) | $21 | Per request; form or property incident search report | 2.12.040 | ||
Open Burning Permit | $287 | Annual | 2.12.040 | ||
Place of Assembly Permits | |||||
0 - 5,000 sq. feet | $287 | Annual | 2.12.040 | ||
5,001 - 10,000 sq. feet | $427 | Annual | 2.12.040 | ||
10,001 - 25,000 sq. feet | $611 | Annual | 2.12.040 | ||
25,001 - 50,000 sq. feet | $824 | Annual | 2.12.040 | ||
50,001 - 80,000 sq. feet | $1,037 | Annual | 2.12.040 | ||
80,001 - 125,000 sq. feet | $1,295 | Annual | 2.12.040 | ||
125,001 - 200,000 sq. feet | $1,648 | Annual | 2.12.040 | ||
Each additional 20,000 sq. feet above 200,000 | $140 | Annual; in addition to $1,648 | 2.12.040 | ||
Property Search | $21 | 2.12.040 | |||
Pyrotechnic Special Effects Materials Permit | |||||
Flame effects | $287 | Before an audience; single event | 2.12.040 | ||
Indoor Fireworks | $287 | Single event | 2.12.040 | ||
1.4 grain fireworks | $287 | Single event | 2.12.040 | ||
Theatrical display | $287 | Single event | 2.12.040 | ||
Re-inspection | $28 | Fee assessed for each ¼ hour to perform re-inspection, including paperwork and travel time. | 2.12.040 | ||
State Licensed Healthcare Facilities | |||||
0 - 3,000 sq. feet | $213 | Annual | 2.12.040 | ||
3,001 - 6,000 sq. feet | $288 | Annual | 2.12.040 | ||
6,001 - 10,000 sq. feet | $353 | Annual | 2.12.040 | ||
10,001 sq. feet or greater | $427 | Annual | 2.12.040 | ||
Temporary Membrane Structures, Tents or Canopies | |||||
Single event | $213 | Up to 180 days. See Also Special Events. | 2.12.040 | ||
Each additional structure on same site | $1 | See Also Special Events | 2.12.040 | ||
Re-inspection of additional set up | $1 | 1 - 2 per week. See Also Special Events | 2.12.040 | ||
Non-Combustible Temporary Structures <180 days | $197 | up to 180 days. See Also Special Events | 2.12.040 |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 29 |
GOLF | ||||||||
For questions regarding Golf Fees Contact: 801.485.7730 | ||||||||
Service | Fee | Additional Information | Section | |||||
Advance Tee Time Reservations | ||||||||
0-7 days in advance | No fee | 15.16.031 | ||||||
8 days to one year in advance | $10 | Non-refundable, per player | 15.16.031 | |||||
No-Show Fee | Minimum $10 | Per 9 hole reservation, Per each player, charged based on course availability. | 15.16.031 | |||||
No-Show Fee | Minimum $20 fee at Bonneville and Mountain Dell | Per 9 hole reservation, Per each player, charged based on course availability. | 15.16.031 | |||||
Membership Programs | Regular | Junior (17 years old or younger) | Senior (60 year old and older) | |||||
City Club | $100 | NA | NA | Plus tax, See Section 15.16.031.A.6 | 15.16.031 | |||
City Pass | $1,800 | $600 | $1,400 | Plus tax, See Section 15.16.031.A.7 | 15.16.031 | |||
Golf Gift Cards | ||||||||
Golf Gift Card Monthly Service | $3 | Applied monthly after 12 months of inactivity | 15.16.031 | |||||
Golf Cart Rentals | 9 Holes | 18 Holes | 15.16.031 | |||||
Bonneville, Glendale, Mountain Dell | $10 | $20 | Per rider. Tax included in fee | 15.16.031 | ||||
Forest Dale, Nibley Park, Rose Park | $10 | $20 | Per rider. Tax included in fee | 15.16.031 | ||||
Private Cart Trail Fee | $10 | $20 | Tax included in fee | 15.16.031 | ||||
Cover rental | $5 | $10 | Tax included in fee | 15.16.031 | ||||
Golf Club Rentals | ||||||||
Regular | $10 | $20 | Tax included in fee | 15.16.031 | ||||
Premium | $20 | $35 | Tax included in fee | 15.16.031 | ||||
Mountain Dell Premium | $25 | $45 | Tax included in fee. 3-ball sleeve w/each 9 holes. | 15.16.031 | ||||
Green Fees: As of January 1, 2022 $2.00 per 9-hole/$4.00 per 18-hole round less sales tax will be allocated to a dedicated Golf CIP fund to be used exclusively for golf course improvement projects. | ||||||||
Actual green fees charged for seniors, juniors, school golf teams, and group rates are subject to change and may vary from the prices listed on the Consolidated Fee Schedule. All active golf fees are listed in the golf shop for each course and on www.slcgov.com | ||||||||
Green Fees - Tax included in listed green fees General Public Rates | Time frame subject to change as needed by Golf Director or designee. | |||||||
Courses | 9 Holes | 18 Holes | General Public Rate Time Frame | |||||
Bonneville | $23 | $46 | Every Day | 15.16.031 | ||||
Forest Dale | $18 | NA | All Day, Every Day | 15.16.031 | ||||
Glendale | $20 | $40 | All Day, Every Day | 15.16.031 | ||||
Mountain Dell | $25 | $44 | All Day, Every Day | 15.16.031 | ||||
Nibley Park | $17 | NA | All Day, Every Day | 15.16.031 | ||||
Rose Park | $18 | $36 | All Day, Every Day | 15.16.031 | ||||
Twilight Rates | ||||||||
Mountain Dell | NA | $54 | Time frame posted on website and in pro shop. Cart included. | 15.16.031 | ||||
Bonneville – Cart included | NA | $45 | Time frame posted on website and in pro shop. Cart included. | 15.16.031 | ||||
Bonneville – Cart not included | NA | $35 | Time frame posted on website and in pro shop. Cart included. | 15.16.031 | ||||
Senior Rates - Age 60 and above | See Section 15.16.031.B. | |||||||
Courses | 9 Holes | 18 Holes | Senior Rate Time Frame | |||||
Bonneville | $20 | $40 | Mon - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Forest Dale | $16 | NA | Mon - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Glendale | $17 | $34 | Mon - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Mountain Dell | $22 | $40 | Mon - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Nibley Park | $15 | NA | Mon - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Rose Park | $16 | $32 | Mon - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Twilight Rates | ||||||||
Mountain Dell | NA | $48 | Time frame to be determined by course and posted in the clubhouse. Cart Included. | 15.16.031 | ||||
City Club Membership Rates | ||||||||
Courses | 9 Holes | 18 Holes | Regular LoyalTee Time Frame |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 30 |
Bonneville | $19 | $38 | Mon - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Forest Dale | $14 | NA | Mon - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Glendale | $16 | $32 | Mon - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Mountain Dell | $21 | $38 | Mon - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Nibley Park | $13 | NA | Mon - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Rose Park | $14 | $28 | Mon - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Senior City Club Membership Rates | ||||||||
Courses | 9 Holes | 18 Holes | Senior LoyalTee Time Frame | |||||
Bonneville | $16 | $32 | Mon - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Forest Dale | $12 | NA | Mon - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Glendale | $13 | $26 | Mon - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Mountain Dell | $18 | $32 | Mon - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Nibley Park | $11 | NA | Mon - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Rose Park | $12 | $24 | Mon - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Young Adult Rates - Age 18-25 | ||||||||
Courses | 9 Holes | 18 Holes | Young Adult Time Frame | |||||
Bonneville | $18 | $36 | Mon - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Forest Dale | $16 | NA | Mon - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Glendale | $16 | $32 | Mon - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Mountain Dell | $20 | $36 | Mon - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Nibley Park | $14 | NA | Mon - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Rose Park | $14 | $28 | Mon - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Twilight Rates | ||||||||
Mountain Dell | NA | $44 | Time frame posted on website and in pro shop. Cart included. | 15.16.031 | ||||
Junior Rates - Age 6 through Age 17 | ||||||||
Courses | 9 Holes | 18 Holes | Junior Rates Time Frame | |||||
Bonneville | $12 | $24 | Mon - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Forest Dale | $10 | NA | Mon - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Glendale | $10 | $20 | Mon - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Mountain Dell | $15 | $24 | Mon - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Nibley Park | $9 | NA | Mon - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Rose Park | $9 | $18 | Mon - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Pull Cart Rental | 9 Holes | 18 Holes | ||||||
Pull Cart | $4 | $8 | Tax included in fee | 15.16.031 | ||||
Range Balls | Tax included in fee | |||||||
Warm-Up Bucket | $6 | Per bucket | 15.16.031 | |||||
Small bucket | $8 | Per bucket | 15.16.031 | |||||
Large bucket | $12 | Per bucket | 15.16.031 | |||||
10 Bucket Range Pass | $90 | 10 large buckets | 15.16.031 | |||||
High School Golf Team | ||||||||
Courses | 9 Holes | 18 Holes | School Golf Team Rate Time Frame | |||||
Bonneville | $12 | $24 | Mon. - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Forest Dale | $10 | NA | Mon. - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Glendale | $10 | $20 | Mon. - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Mountain Dell | $15 | $24 | Mon. - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Nibley park | $9 | NA | Mon. - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Rose Park | $9 | $18 | Mon. - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Large Bucket of Range Balls | $8.00 | Per Bucket | 15.16.031 | |||||
University Team Rates | ||||||||
Courses | 9 Holes | 18 Holes | University Team Rate Time Frame | |||||
Bonneville | $15 | $30 | Mon. - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Forest Dale | $13 | NA | Mon. - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Glendale | $13 | $26 | Mon. - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Mountain Dell | $15 | $30 | Mon. - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Nibley Park | $11 | NA | Mon. - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Rose Park | $12 | $24 | Mon. - Fri, all day & Sat/Sun after 2PM | 15.16.031 | ||||
Large Bucket of Range Balls | $8 | Per Bucket | 15.16.031 | |||||
Eligible Employee Rates – As defined in Golf Division’s Complimentary Golf Policy |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 31 |
Courses | 9 Holes | 18 Holes | Eligible Employee Time Frame | |||||
Bonneville | $2 | $4 | As outlined in Complimentary Golf Policy | 15.16.031 | ||||
Forest Dale | $2 | $4 | As outlined in Complimentary Golf Policy | 15.16.031 | ||||
Glendale | $2 | $4 | As outlined in Complimentary Golf Policy | 15.16.031 | ||||
Mountain Dell | $2 | $4 | As outlined in Complimentary Golf Policy | 15.16.031 | ||||
Nibley Park | $2 | $4 | As outlined in Complimentary Golf Policy | 15.16.031 | ||||
Rose Park | $2 | $4 | As outlined in Complimentary Golf Policy | 15.16.031 | ||||
Non-Eligible Employee Rates – As defined in Golf Division’s Complimentary Golf Policy | ||||||||
Courses | 9 Holes | 18 Holes | Non-Eligible Employee Time Frame | |||||
Bonneville | $10 | $20 | As outlined in Complimentary Golf Policy | 15.16.031 | ||||
Forest Dale | $9 | NA | As outlined in Complimentary Golf Policy | 15.16.031 | ||||
Glendale | $9 | $18 | As outlined in Complimentary Golf Policy | 15.16.031 | ||||
Mountain Dell | $10 | $20 | As outlined in Complimentary Golf Policy | 15.16.031 | ||||
Nibley Park | $8 | NA | As outlined in Complimentary Golf Policy | 15.16.031 | ||||
Rose Park | $8 | $16 | As outlined in Complimentary Golf Policy | 15.16.031 | ||||
Cafe Employee Rates – As defined in Golf Division’s Complimentary Golf Policy | ||||||||
Courses | 9 Holes | 18 Holes | Non-Eligible Employee Time Frame | |||||
Bonneville | $10 | $20 | As outlined in Complimentary Golf Policy | 15.16.031 | ||||
Forest Dale | $9 | NA | As outlined in Complimentary Golf Policy | 15.16.031 | ||||
Glendale | $9 | $18 | As outlined in Complimentary Golf Policy | 15.16.031 | ||||
Mountain Dell | $10 | $20 | As outlined in Complimentary Golf Policy | 15.16.031 | ||||
Nibley Park | $8 | NA | As outlined in Complimentary Golf Policy | 15.16.031 | ||||
Rose Park | $8 | $16 | As outlined in Complimentary Golf Policy | 15.16.031 | ||||
Industry Rates – As defined in Golf Division’s Complimentary Golf Policy | ||||||||
Courses | 9 Holes | 18 Holes | Non-Eligible Employee Time Frame | |||||
Bonneville | $30 | $30 | As outlined in Complimentary Golf Policy | 15.16.031 | ||||
Forest Dale | $10 | NA | As outlined in Complimentary Golf Policy | 15.16.031 | ||||
Glendale | $10 | $20 | As outlined in Complimentary Golf Policy | 15.16.031 | ||||
Mountain Dell | $30 | $30 | As outlined in Complimentary Golf Policy | 15.16.031 | ||||
Nibley Park | $10 | NA | As outlined in Complimentary Golf Policy | 15.16.031 | ||||
Rose Park | $10 | $20 | As outlined in Complimentary Golf Policy | 15.16.031 | ||||
Golf Simulator Rental Fees | ||||||||
Forest Dale Simulators | $45 per hour rental fee per bay | Up to four players per bay | 15.16.031 | |||||
Tournament Fees/Group Fees | ||||||||
All Courses - Tournament Fee | $10 | Per Player - Discretion of Head Professional | 15.16.031 | |||||
Bonneville Groups under 72 | $85 | Per Player | 15.16.031 | |||||
Bonneville Groups over 72 | $12,000 | Course Rental Fee - Shotgun Tournament | 15.16.031 | |||||
Forest Dale Weekday morning | $2,500 | Course Rental Fee - Shotgun Tournament | 15.16.031 | |||||
Forest Dale weekday Afternoon | $3,000 | Course Rental Fee - Shotgun Tournament | 15.16.031 | |||||
Forest Dale Weekend Morning | $3,500 | Course Rental Fee - Shotgun Tournament | 15.16.031 | |||||
Mountain Dell Groups under 72 | $85 | Per Player | 15.16.031 | |||||
Mountain Dell Groups over 72 | $14,000 | Course Rental Fee - Shotgun Tournament | 15.16.031 |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 32 |
IMPACT FEES | ||||||||
For questions regarding Impact fees contact: 801.535.7712 | ||||||||
Service | Fee | Additional Information | Section | |||||
Appeals Process | $50 | 18.98.090 | ||||||
Developers Independent Calculation Deposit | $150 | Could be refunded or increased based upon actual total costs. | 18.98.160 | |||||
Impact Fees | Single Family | Multi-Family | Office | Industrial | Commercial/ Retail | |||
Residential (per Unit) | (Per 1,000 SF) | |||||||
Fire | $171 | $171 | $53 | $25 | $250 | 18.98.160 | ||
Park | $5,173 | $3,078 | $0 | $0 | $0 | 18.98.090 | ||
Police | $59 | $59 | $20 | $10 | $86 | 18.98.160 | ||
Transportation | $429 | $242 | $498 | $290 | $1,955 | 18.98.090 | ||
Storm Water | $374 | Per 1/4 acre | 17.81.400 |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 33 |
PARKING AND TRAFFIC | ||||
For questions regarding Parking and Traffic contact: 801.535.6630 | ||||
Service | Fee | Additional Information | Section | |
Past Due Account Receivable Interest | 5% | 3.16.040 | ||
Administrative Fee For Collection of Past Due Debts | $64 | 12.56.550 | ||
Area Regular Parking Permits | ||||
One year | $51 | 10 - 12 Months | 12.64.090 | |
9 - 11 months | $38 | 7 - 9 Months | 12.64.090 | |
5 - 8 months | $26 | 4 - 6 Months | 12.64.090 | |
1 - 4 Months | $13 | 1 - 3 Months | 12.64.090 | |
Area Seasonal Parking Collection | ||||
5 - 8 months | $26 | 4 - 6 Months | 12.64.090 | |
3 - 4 months | $13 | 1 -3 Months | 12.64.090 | |
Barricade Permit | $41 | 14.32.418 | ||
Freight Curb Loading Zone Permit | Base Business License fee | Annual; plus sticker fee | 12.56.330 | |
Freight License Parking Permit | $99 | Annual | 12.56.330 | |
Freight License Parking Permit Replacement | $7 | 12.56.330 | ||
Library Parking Fees | ||||
Library Daily Rates | $1.50/half hour | First half hour free, library patrons may receive up to 2 hours free, $12 daily maximum | 12.56.580 | |
Loading Zone & Restricted Parking | ||||
Loading zone & restricted parking | $28/vehicle per day | For provisions and exemptions see Section 12.56.325 | 12.56.325 | |
Events | $12/vehicle per day | For provisions and exemptions see Section 12.56.325 | 12.56.325 | |
Filming (movie, television series or commercial) | $12/vehicle per day | For provisions and exemptions see Section 12.56.325 | 12.56.325 | |
Business Parking Permit | $500 | 12.56.580 | ||
Parking Meter Rates | $3.50 | Per hour, Monday - Saturday, 8am - 10pm | 12.56.170 | |
Residential Transit Pass (Hive Pass) | ||||
Annual Hive Voucher Pass | $350 | Only available to qualifying individuals through social service agencies | 3.16.2060 | |
Annual Hive Co-op Pass | $475 | 3.16.2060 | ||
Monthly Hive Co-op Pass | $42 | 3.16.2060 | ||
Street Name Change Application | $354 | 14.08.015 | ||
Traffic School | ||||
Traffic School | $65 | 12.8.150 | ||
Traffic School - Tier II | $90 | At the prosecutor's discretion | 12.8.150 | |
Traffic School - Tier III | $105 | At the prosecutor's discretion | 12.8.150 | |
Temporary Closure/Removal - Parking Meters | $28 | Per meter, per day | 14.12.130 | |
Temporary Placing of Bags on Parking Meters | $50 | Per meter, per day | 12.56.210 | |
During filming of a movie/television series/ commercial | $12 | Per day | 12.56.210 | |
For an event that continues for not less than 3 days | $12 | Per day/must significantly foster area business promotion and have an expected attendance exceeding 5,000 | 12.56.210 | |
For use under the direction of the city in connection with a city sponsored event | No charge | 12.56.210 | ||
Vehicle Relocation Fee - Small | $80 | Light Vehicle with a GVWR of 10,000 lbs or less | 12.56.540 | |
Vehicle Relocation Fee - Mid | $110 | Medium Vehicle with a GVWR of 10,001 lbs to 26,000 lbs | 12.56.540 | |
Vehicle Relocation Fee - Large | $140 | Large Vehicle with a GVWR of 26,001 lbs or greater | 12.56.540 |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 34 |
POLICE | |||||||||
For questions regarding Police fees contact: 801.799.3101 | |||||||||
Service | Fee | Additional Information | Section | ||||||
911 Emergency Service fee | See Fire | ||||||||
Background Search and Letter | Not more than $16 | Age 65+ exempt/waiver available, see Section 2.10.090 | 2.10.080 | ||||||
Fingerprinting | Not more than $55 | Age 65+ exempt | 2.10.010 | ||||||
ID Cards | Not more than $55 | Age 65+ exempt | 2.10.010 | ||||||
Incident Reports | See Additional Information | Not more than the fee charged by the State of Utah for similar reports | 2.64.040 | ||||||
Personal Criminal History Record | $7 | Age 65+ exempt | 2.10.050 | ||||||
Theft Reports | Not more than $55 | Age 65+ exempt | 2.10.010 | ||||||
User's Security and Privacy Non-disclosure Agreement | Not more than $55 | Age 65+ exempt | 2.10.050 | ||||||
Vehicle Booting Fee | |||||||||
Vehicle booting fee | $75 | 12.96.025 | |||||||
Late removal of boot fee | $34 | Per day after first 24 hours | 12.96.025 | ||||||
Boot damage or replacement fee | City's actual costs incurred | Determined by the total cost(s) required by the City for replacement or repair of the immobilization device | 12.96.025 | ||||||
Registration Fee | $42 | 12.96.025 | |||||||
Sex Offender Registration Fee | $25 | ||||||||
Special Events and Secondary Employment | |||||||||
Police Coverage | $103 | Per hour, per officer, not to exceed actual cost | 3.50.080 | ||||||
Police Special Equipment Fee (Car Charge) | $3 | Per hours, plus fuel surcharge | 3.50.080 | ||||||
Community Response Team | $54 | Per hour, not to exceed actual cost | |||||||
Barricade Fee | $20 | Per street closure | |||||||
Vehicle Relocation Fee - Small | $80 | Light Vehicle with a GVWR of 10,000 lbs or less | 12.56.540 | ||||||
Vehicle Relocation Fee - Mid | $110 | Medium Vehicle with a GVWR of 10,001 lbs to 26,000 lbs | 12.56.540 | ||||||
Vehicle Relocation Fee - Large | $140 | Large Vehicle with a GVWR of 26,001 lbs or greater | 12.56.540 | ||||||
Towing Operational Costs: MUST COMPLY WITH STATE REGULATION R909-19 | |||||||||
Size of tow | Base Tow Rate | Varies based on size of vehicle | 12.96.025 | ||||||
Light Duty | $205 | There will be an additional $36.25 added for each additional 15 minutes. Any vehicle with GVWR of 10,000 lbs or less | 12.96.025 | ||||||
Medium Duty | $341 | There will be an additional $60.00 added for each additional 15 minutes. Vehicles with a GVWR of 10,001 to 26,000 lbs | 12.96.025 | ||||||
Heavy Duty | $422 | There will be an additional $75.00 added for each additional 15 minutes. Vehicles with a GVWR of 26,001 lbs or greater | 12.96.025 | ||||||
Vehicle Storage Fee: MUST COMPLY WITH STATE REGULATION R909-19 | |||||||||
Size of tow (Non-Consent Police Generated Tow) | Varies based on size and location stored | 12.96.025 | |||||||
Light Duty - Stored Inside | $46 | Per Day (Except vehicles held in evidence) | 12.96.025 | ||||||
Light Duty - Stored Outside | $41 | Per Day (Except vehicles held in evidence) | 12.96.025 | ||||||
Medium Duty - Stored Inside | $87 | Per Day (Except vehicles held in evidence) | 12.96.025 | ||||||
Medium Duty - Stored Outside | $61 | Per Day (Except vehicles held in evidence) | 12.96.025 | ||||||
Heavy Duty - Stored Inside | $87 | Per Day (Except vehicles held in evidence) | 12.96.025 | ||||||
Heavy Duty - Stored Outside | $61 | Per Day (Except vehicles held in evidence) | 12.96.025 | ||||||
Vehicles Used in Transporting Hazardous Material - Stored Inside | $168 | Per Day (Except vehicles held in evidence) | 12.96.025 | ||||||
Vehicles Used in Transporting Hazardous Material - Stored Outside | $117 | Per Day (Except vehicles held in evidence) | 12.96.025 | ||||||
Administration Fee | $43 | Maximum Per Vehicle (Notification for reporting non- consent tows) | 12.96.025 | ||||||
Vehicle Storage Fee: MUST COMPLY WITH STATE REGULATION R909-19 | |||||||||
Size of tow (Non-Consent Non-Police Generated Tow) | Varies based on size and location stored | 12.96.025 | |||||||
Light Duty - Stored Inside | $46 | Per Day (Except vehicles held in evidence) | 12.96.025 | ||||||
Light Duty - Stored Outside | $41 | Per Day (Except vehicles held in evidence) | 12.96.025 | ||||||
Medium Duty - Stored Inside | $87 | Per Day (Except vehicles held in evidence) | 12.96.025 | ||||||
Medium Duty - Stored Outside | $61 | Per Day (Except vehicles held in evidence) | 12.96.025 | ||||||
Heavy Duty - Stored Inside | $87 | Per Day (Except vehicles held in evidence) | 12.96.025 | ||||||
Heavy Duty - Stored Outside | $61 | Per Day (Except vehicles held in evidence) | 12.96.025 | ||||||
Vehicles Used in Transporting Hazardous Material - Stored Inside | $168 | Per Day (Except vehicles held in evidence) | 12.96.025 | ||||||
Vehicles Used in Transporting Hazardous Material - Stored Outside | $117 | Per Day (Except vehicles held in evidence) | 12.96.025 | ||||||
Administration Fee | $43 | Maximum Per Vehicle (Notification for reporting non- consent tows) | 12.96.025 |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 35 |
Fuel Surcharge: MUST COMPLY WITH STATE REGULATION R909-19-15 | |||||||||
Fuel Surcharge Based on Fuel Price | Varies based on the daily Rocky Mountain Average as determined by the Department of Energy (http:// www.fwccinc.com/doefuel.html). When the price of fuel reaches $3.25 per gallon, a tow truck motor carrier may charge a surcharge equal to 5% of the base tow rate. An additional 5% shall be allowed for each $0.25 per gallon increase. Conversely, as the price of fuel drops, the fuel surcharge shall decrease by the same rate | See Utah Regulation R909-19-15 | |||||||
Fuel Price | $3.50 | $4.00 | $4.50 | $5.00 | |||||
Size of Tow | |||||||||
Light Duty | $14.50 | $29.00 | $43.50 | $58.00 | |||||
Medium Duty | $24.00 | $48.00 | $72.00 | $96.00 | |||||
Heavy Duty | $30.00 | $60.00 | $90.00 | $120.00 | |||||
Property Removal Fee | $103 | Per each 30 minute time period | |||||||
No Trespass Sign | $30.96 | Plus tax. Fee will be waived when sign is placed by SLCPD. | |||||||
Body Cam Redaction and Video Production | $46 | Per Hour; Billable in quarter hour increments. No charge for the first quarter hour of staff time. | 2.64.040 | ||||||
Body Cam DVD | $33 | 2.64.040 | |||||||
Building Rental/Use: Public Safety Building and Pioneer Precinct | |||||||||
Activity with food | $957 | 15.14.020 | |||||||
Filming (Commercial) | |||||||||
Fewer than 8 staff, crew and other persons | $368 | Each 4 hour block | 15.14.020 | ||||||
8 - 15 staff, crew and other persons | $722 | Each 4 hour block | 15.14.020 | ||||||
More than 15 staff, crew and other persons | $1,544 | Each 4 hour block | 15.14.020 | ||||||
Miscellaneous Meetings | |||||||||
Regular city business hours (8am - 5pm) | $55/hr | Up to 40 people, no more than three hours | 15.14.020 | ||||||
Non-city business hours | $55/hr | See Section 15.14.020 | 15.14.020 | ||||||
Supplemental Charge for Exclusive Building Use | $147 | 15.14.020 | |||||||
Wedding Ceremony | |||||||||
Base fee for two hours | $235 | No food | 15.14.020 | ||||||
Damage to City Property | City's Cost | 3.50.080 | |||||||
GRAMA Request | $20 | Per Hour; billable in quarter hour increments. Charges begin after first 15 minutes of research or record compilation. |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 36 |
PARKS AND PUBLIC LANDS | ||||||||||||
For questions regarding Parks and Public Lands contact: 801.535.7800 | ||||||||||||
Service | Fee | Additional Information | Section | |||||||||
Community Programs and Classes | ||||||||||||
After School Programs | Formula based | See Section 15.16.090 | 15.16.090 | |||||||||
Community Art/Enrichment | ||||||||||||
Youth | not more than $31 | |||||||||||
Adult | not more than $47 | |||||||||||
Community Stewardship & Education | ||||||||||||
Youth | not more than $31 | |||||||||||
Adult | not more than $47 | |||||||||||
Outdoor Recreation | ||||||||||||
Youth | not more than $31 | |||||||||||
Adult | not more than $47 | |||||||||||
Equipment Rental | $18 plus sales tax | Each with pavilion reservation; limit 2 per reservations | 15.16.020 | |||||||||
Recreation kit rental - late fee | $7 | Late fee day, per day | 15.16.020 | |||||||||
Recreation kit rental - replacement fee | $340 plus sales tax | Total cost of the entire recreation kit if it needs to be replaced | 15.16.020 | |||||||||
Recreation Bag | $63 | Replacement cost of bag only | 15.16.020 | |||||||||
Volleyball Net | $50 | Replacement cost of volleyball net only | 15.16.020 | |||||||||
Volleyball | $25 | Replacement cost of volleyball only | 15.16.020 | |||||||||
Baseball bat (2) | $38 each | Replacement cost per baseball bat only | 15.16.020 | |||||||||
Softball (2) | $13 each | Replacement cost per softball only | 15.16.020 | |||||||||
Football | $25 | Replacement cost of football only | 15.16.020 | |||||||||
Soccer Ball | $25 | Replacement cost of soccer ball only | 15.16.020 | |||||||||
Horseshoe Set | $50 | Replacement cost of horseshoe set only | 15.16.020 | |||||||||
Kayak - single | $30 | for reservation window | 15.16.020 | |||||||||
Kayak - tandem | $49 | for reservation window | 15.16.020 | |||||||||
Park Facility Reservations | ||||||||||||
Athletic Facility Reservations | ||||||||||||
Recreational (Non-organized or affiliate group), one-time use Tier B field | $24 | Per hour/two hour minimum | 15.16.010 | |||||||||
Recreational (Non-organized or affiliate group), one-time use Tier C field | $18 | Per hour/two hour minimum | 15.16.010 | |||||||||
Organized League Use per Hour per Field | Tier B Field | Tier C Field | ||||||||||
Youth | $10 | $8 | 15.16.010 | |||||||||
Adult | $18 | $15 | 15.16.010 | |||||||||
Recreational tournaments with season reservations | $131 | Per Day | ||||||||||
Recreational tournaments without season reservations | $261 | Per Day | 3.50.080 | |||||||||
Any cleaning required after field usage | $52 | Per staff hour | 15.16.010 | |||||||||
Outdoor Volleyball Court Fees and Liberty Park | ||||||||||||
Recreational One Time Use Fees | $12 | Per Hour | 15.16.010 | |||||||||
Youth Volleyball League | $6 | Per Hour Per Court (1/2 of one time use field rate) | 15.16.010 | |||||||||
Adult Volleyball League | $9 | Per Hour Per Court (1/2 of one time use field rate) | 15.16.010 | |||||||||
Pavilion Reservations | Resident | Non-resident | ||||||||||
Pavilions (does not include Liberty Park Rice Pavilion and Washington Park/ Mountain Dell) | $59 | $71 | Full day | 15.16.020 | ||||||||
Washington Park/Mountain Dell Pavilions (AM) | $110 | $147 | Half day (8am - 2pm) | 15.16.020 | ||||||||
Washington Park/Mountain Dell Pavilions (PM) | $110 | $147 | Half day (3pm - 10pm) | 15.16.020 | ||||||||
Liberty Park - Rice Pavilion (AM) | $59 | $74 | Half day (8am - 2pm) | 15.16.020 | ||||||||
Liberty Park - Rice Pavilion (PM) | $59 | $74 | Half day (3pm - 10pm) | 15.16.020 | ||||||||
Cottonwood Park - Pavilion | $38 | $50 | Full day | 15.16.020 | ||||||||
Wedding Ceremony Permit Fees | $220 | $220 | Additional $42 per hour for any cleaning required after pavilion use | 15.16.020 | ||||||||
Wedding Ceremony Permit Fees - International Peace Gardens | $220 | $220 | Per 2 hour block + additional $42 per hour for any cleaning required after pavilion use | 15.16.020 | ||||||||
Premier Fields Athletic Center (RAC): | ||||||||||||
Fields are available for games only | Weekdays, Per Hour | Weekends, Per Hour | Setup Costs/Full Day | Lights Per Hour | ||||||||
Split Field Fee | $30 | 15.16.010 | ||||||||||
Upright Setup Fee | $125 | 15.16.010 |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 37 |
Hashmark Fee | $100 | 15.16.010 | ||||||||||
Cleaning Charge Per Field | $100 | 15.16.010 | ||||||||||
Youth Resident Field Rental | $59 | $69 | $19 | 15.16.010 | ||||||||
Adult Resident Field Rental | $82 | $95 | $19 | 15.16.010 | ||||||||
Youth Non-Resident Field Rental | $82 | $95 | $19 | 15.16.010 | ||||||||
Adult Non-Resident Field Rental | $95 | $107 | $19 | 15.16.010 | ||||||||
Resident Stadium Field Rental | $177 | $195 | $36 | 15.16.010 | ||||||||
Non-Resident Stadium Field Rental | $195 | $215 | $36 | 15.16.010 | ||||||||
Tournament Field Rental* | $883 | (Depends on Field Type) | 15.16.010 | |||||||||
Full Complex Rental | $252 | 15.16.010 | ||||||||||
* >10 hours | ||||||||||||
Seasonal Youth League Food and Beverage Service Permits | ||||||||||||
Concession Stands | ||||||||||||
Concession - with electricity and/or plumbing | $74 | Per month | 15.16.110 | |||||||||
Concession - temporary without electricity and/or plumbing | $37 | Per month | 15.16.110 | |||||||||
Tennis Courts | ||||||||||||
Wasatch Hills and Liberty Park | Hours: Monday - Friday 7:00am to close | Saturday, Sunday & holidays 8:00am to close | ||||||||||
Indoor (bubble) | ||||||||||||
Court | $30 | Per court, per hour | 15.16.060 | |||||||||
Outdoor | ||||||||||||
Court (8 or Less Courts Used) | $10 | Per court, per hour | 15.16.060 | |||||||||
Court (9 or More Courts Used | $12 | Per court, per hour | 15.16.060 | |||||||||
Reservation Fee | $2 | Per court, per reservation | 15.16.060 | |||||||||
Tournament | ||||||||||||
Additional Tournament fee | $4 | Per court, per day reservation fee | ||||||||||
$250 | Per Tournament | 15.16.060 | ||||||||||
All Other Courts | No charge | 15.16.060 | ||||||||||
Facility Reservation Cleanup and Repair Fees | ||||||||||||
Supervisor | $36 | Per Hour | 3.50.080 | |||||||||
Graffiti Response Tech | $22 | Per Hour | 3.50.080 | |||||||||
General Maintenance Worker | $30 | Per Hour | 3.50.080 | |||||||||
Parks Maintenance Technician II | $25 | Per Hour | 3.50.080 | |||||||||
Parks Maintenance Technician I | $18 | Per Hour | 3.50.080 | |||||||||
Seasonal/Part-time Employee | $18 | Per Hour | 3.50.080 | |||||||||
Plumber | $34 | Per Hour | 3.50.080 | |||||||||
Irrigation Tech | $29 | Per Hour | 3.50.080 | |||||||||
Irrigation Seasonal | $21 | Per Hour | 3.50.080 | |||||||||
Electrical Usage | $0.11 | Per Kilowatt Hour - $15.29 Minimum | 3.50.080 | |||||||||
Restroom Cleaning | $34 | Per Cleaning | 3.50.080 | |||||||||
Damage to City Property | Varies based on damage | Based on city's cost | 3.50.080 | |||||||||
Damage to Landscape | ||||||||||||
Sod Replacement | $0.44 | Per Square Foot | 3.50.080 | |||||||||
Peat Moss | $21 | Per Bale (cost is $21.21) | 3.50.080 | |||||||||
Lawn Seed | $135 | Per Bag | 3.50.080 | |||||||||
Top Soil | $39 | Per Yard | 3.50.080 | |||||||||
Fertilizer 30-2-9 50/50 Blend | $45 | Per Bag | 3.50.080 | |||||||||
Fertilizer 18-24-5 Starter | $62 | Per Bag | 3.50.080 | |||||||||
Fertilizer 28-2-10 Slow Release | $46 | Per Bag | 3.50.080 | |||||||||
Fertilizer 38-0-0 Fall | $47 | Per Bag | 3.50.080 | |||||||||
Tree Replacement | Varies per size of tree | Based on city's cost to replace damaged tree | 3.50.080 | |||||||||
Wetting Agent | $120 | Per 40 lb bag | 3.50.080 | |||||||||
Wetting Agent + Organic 3-1-0 | $52 | Per 50 lb bag | 3.50.080 | |||||||||
Paver Replacement | ||||||||||||
Paver Cleaning | $300 per 1/2 day; $600 per day | Based on city's cost | 3.50.080 |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 38 |
Equipment Damage and Parts | Varies based on damage | Based on city's cost | 3.50.080 | |||||||||
Irrigation Damage and Parts | Varies based on damage | Based on city's cost | 3.50.080 | |||||||||
Fuel Costs | Based on City's Cost | 3.50.080 | ||||||||||
Use of Equipment | ||||||||||||
1 Ton Dump Truck | $34 | Per Hour | 3.50.080 | |||||||||
Aerator (Walk Behind) | $11 | Per Hour | 3.50.080 | |||||||||
Aerator, Tractor Mounted (including Tractor) | $20 | Per Hour | 3.50.080 | |||||||||
ATLV | $18 | Per Hour | 3.50.080 | |||||||||
Backhoe | $48 | Per Hour | 3.50.080 | |||||||||
Blower, Backpack (Stihl) | $2 | Per Hour | 3.50.080 | |||||||||
Blower (Walk Behind) | $8 | Per Hour | 3.50.080 | |||||||||
Edger, Grass (Power Trim) | $8 | Per Hour | 3.50.080 | |||||||||
Leafbed/10 Wheeler | $67 | Per Hour | 3.50.080 | |||||||||
Loader | $68 | Per Hour | 3.50.080 | |||||||||
Mixer | $13 | Per Hour | 3.50.080 | |||||||||
Mower, Bagger (Snapper) | $8 | Per Hour | 3.50.080 | |||||||||
Mower, Riding (Toro/Kubota) | $20 | Per Hour | 3.50.080 | |||||||||
Mower, Side Discharge (Eastman) | $7 | Per Hour | 3.50.080 | |||||||||
Mower, Wide Area (Jacobsen 9016) | $42 | Per Hour | 3.50.080 | |||||||||
Pickup Truck | $17 | Per Hour | 3.50.080 | |||||||||
Plow, Jeep Mounted (Including Jeep) | $12 | Per Hour | 3.50.080 | |||||||||
Plow, Truck (Including Truck) | $24 | Per Hour | 3.50.080 | |||||||||
Pressure Washer | $9 | Per Hour | 3.50.080 | |||||||||
Pressure Washer with Heat | $21 | Per Hour | 3.50.080 | |||||||||
Snowthrower (Toro) | $3 | Per Hour | 3.50.080 | |||||||||
Sprayer, Pull Behind (Including Pickup) | $19 | Per Hour | 3.50.080 | |||||||||
Spreader Top Dresser, Pull Behind (Including Pickup) | $19 | Per Hour | 3.50.080 | |||||||||
Sweeper, Tractor Mounted (Including | $34 | Per Hour | 3.50.080 | |||||||||
Track hoe | $18 | Per Hour | 3.50.080 | |||||||||
Tractor and Seeder | $18 | Per Hour | 3.50.080 | |||||||||
Trimmer, Hedger (Stihl) | $5 | Per Hour | 3.50.080 | |||||||||
Trimmer, Line (Maruyama, Echo) | $17 | Per Hour | 3.50.080 | |||||||||
Utility Truck 4X4 | $14 | Per Hour | 3.50.080 | |||||||||
Truck with Trailer | $20 | Per Hour | 3.50.080 | |||||||||
Landscaping Permit for Public Right of Way | $21 | Per Job, or $80.66 Per Year | 2.26.210 | |||||||||
Special Event Permit | $147 | Commercially related (community events) | 3.50.080 | |||||||||
Special Event Filming Permit | $147 | 21A.42.070 | ||||||||||
Special Event Demonstrations (Free Expression) | $7 | 21A.42.070 | ||||||||||
Urban Forestry | ||||||||||||
Public Tree Work Permit | $18 per tree or $185 per year | Permit processing fee, to account for staff time to issue permit and update inventory. | 3.50.080 | |||||||||
Tree Removal Mitigation | The Contracted Rate | This is the average cost (per inch) to purchase and plant a new tree. This fee is charged when code protected trees are removed or damaged. | 3.50.080 |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 39 |
RECORDS AND ELECTIONS | ||||||
For questions regarding Records and Election fees contact: 801.535.7671 | ||||||
Service | Fee | Additional Information | Section | |||
Candidate Filing Fees | Mayor | Council | ||||
File | $464 | $111 | Or petition/ see Section 2.68.010 | 2.68.010 | ||
With Nomination | $456 | $111 | Or additional petition signatures/see Section 2.68.010 | 2.68.010 | ||
Write - in | $456 | $111 | 2.68.020 | |||
Copies of Records | ||||||
Employee time | $20 | Billable in quarter hour increments minus the first 15 minutes. | 2.64.040 | |||
Paper photocopies | $0.10 | Per copy | 2.64.040 | |||
Size C blueprint | $1 | Per copy | 2.64.040 | |||
Produced a microfilm printer (silver paper) | $2 | Per copy | 2.64.040 | |||
From microfilm (plain paper) | $0.10 | Per copy | 2.64.040 | |||
From a photograph | $5 | Per copy | 2.64.040 | |||
Tapes or discs | Cost of media, plus $20/hour for employee time | 2.64.040 | ||||
Incident Reports | See Additional Information | Not more than the fee charged by the State of Utah for similar reports | 2.64.040 | |||
Mylar or Vellum Prints | ||||||
24" x 36" | Not more than $6 | 2.64.040 | ||||
Larger than 24" x 36" | Not more than $2 per square foot | 2.64.040 | ||||
GRAMA Request | $20 | Per Hour; billable in quarter hour increments. Charges begin after first 15 minutes of research or record compilation. | ||||
Declaration of Mutual Commitment | $35 | 10.3.050 | ||||
Termination of Declaration of Mutual Commitment | No charge | 10.03.030 |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 40 |
REFUSE | ||||||
For questions regarding Waste Collection Service fees contact: 801.535.6999 | ||||||
Service | Fee | Additional Information | Section | |||
Green Waste and Recycling | Green Waste | Recycling | ||||
Residences receiving City garbage service | No additional charge | No additional charge | Charge is included in the fee for garbage, recycling and green waste | 9.08.030 | ||
Eligible recycling customers & green waste customers | $12.27 | $12.27 | Per month, per container/eligible recycling customers and green waste customers are non-garbage customers who meet City's service criteria regarding access to curb and location within service route; minimum subscription 12 months. | 9.08.030 | ||
Glass recycling for residences | $8.49 | Per month | 9.08.030 | |||
Garbage | ||||||
40 gallon container | $24.09 | Per month, per container | 9.08.030 | |||
60 gallon container | $30.75 | Per month, per container | 9.08.030 | |||
90 gallon container | $36.52 | Per month, per container | 9.08.030 | |||
Replacement or Removal of Containers | ||||||
When damage is caused by property owner | Actual city cost to purchase container plus $11 | 9.08.140 | ||||
When stolen and theft reported to police | No charge | 9.08.140 | ||||
When stolen and theft not reported to police | Actual city cost for purchase of container | 9.08.140 | ||||
With one of a different size | No charge | 9.08.140 | ||||
Removal of containers for residences and for eligible recycling customers | $11 | Per container | 9.08.030 | |||
Authorized Waste Hauler Permit Fee | $315 | Annual | 9.08.200 | |||
WASTE & RECYCLING - SPECIAL EVENTS | ||||||
Can Delivery, Removal & 1st Dump <100 cans | $20 | Each Can/Per Event | 3.50.080 | |||
Can Delivery, Removal & 1st Dump >100 cans | $25 | Each Can/Per Event | 3.50.080 | |||
Recycling Can Contamination | $22 | Each Can/Per Event | 3.50.080 | |||
Additional Can Dump Service | $2 | Each Can/Dump | 3.50.080 | |||
Can Replacement Cost | Actual Cost | Each Can/Contract Cost | 3.50.080 | |||
Landfill Tipping Fee | Actual Cost | Per Ton | 3.50.080 | |||
Landfill Tipping Fee (Hazardous Material) | Actual Cost | Per Ton | 3.50.080 | |||
Waste & Recycling - Special Events, Use of Equipment | ||||||
Flat Bed Truck | $34 | Per Hour | 3.50.080 | |||
Leafbed/10 Wheeler | $84 | Per Hour | 3.50.080 | |||
Loader | $78 | Per Hour | 3.50.080 | |||
Refuse Packer | $54 | Per Hour | 3.50.080 | |||
Trailer | $4 | Per Hour | 3.50.080 | |||
Waste & Recycling - Special Events, Staff Costs | ||||||
Full-Time Employee | $35 | Per Hour | 3.50.080 | |||
Supervisor | $57 | Per Hour | 3.50.080 | |||
Seasonal Employee | $23 | Per Hour | 3.50.080 | |||
Additional information on termination or suspension see Section 9.08.030E Low Income Abatement: Customers who are granted abatement for taxes on their dwelling shall be granted a 50% abatement of the minimum monthly charge per Section 9.08.030. |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 41 |
SANITARY SEWER UTILITIES | |||||||||||
For questions regarding Sanitary Sewer Charges contact: 801-483.6727 | |||||||||||
Sewer Charges | |||||||||||
Customer Type | Monthly Charge | Volumetric Rate (Flow) | Additional Information | Section | |||||||
Residential | $3.70 | $8.56 | 1. Residential, Duplex and Triplex customers volumetric amount will be based on monthly Average Winter Consumption ( December - February. 2. Multi Family and Commercial volumetric amounts are based on 70% of flow. 3. ERU is Equivalent Residential Unit and is calculated. 4CCF of average monthly flow equals 1 ERU. 4. Volumetric rate is per CCF. | 17.72.030 | |||||||
Duplex | $7.40 | $8.56 | |||||||||
Triplex | $11.10 | $8.56 | |||||||||
Multi Family | $3.70 per Unit | $8.56 | |||||||||
Commercial | $3.70 per ERU | $9.54 | |||||||||
Monitored | Monthly Charge | Flow | Category | Cost per Pound of Discharge | |||||||
$3.70 per ERU | $9.54 | BOD >360 mg/l | $0.53 | ||||||||
TSS >290 mg/l | $0.55 | ||||||||||
NH3 >32mg/l | $2.88 | ||||||||||
TP >7mg/l | $14.52 | ||||||||||
New sewer accounts - Applicable until data required by Section 17.72.030.C.1.a is received | |||||||||||
Single | $46.50 per month | Based on average residential AWC of 5 ccf. | 17.72.030 | ||||||||
Duplex | $46.50 per month/per dwelling unit | Based on average residential AWC of 5 ccf. | 17.72.030 | ||||||||
Triplex | $46.50 per month/per dwelling unit | Based on average residential AWC of 5 ccf. | 17.72.030 | ||||||||
Multiple dwelling | $14.80 per month until Temporary or Permanent Certificate of Occupancy has been requested or Occupancy has occurred, at which point they will be charged $3.70 per dwelling unit as the Monthly Charge | Volumetric Rates as applicable | 17.72.030 | ||||||||
All Other Users | $93.80 | Volumetric Rates as applicable | 17.72.030 | ||||||||
Low Income Abatement: Customers who are granted abatement for taxes on their dwelling shall be granted a five dollar ($5.00) abatement of the monthly charge. | |||||||||||
SANITARY SEWER CONNECTION FEES | |||||||||||
For questions regarding Sanitary Sewer Connection Fees contact: 801.483.6727 | |||||||||||
Service/Size | Fee | Additional Information | Section | ||||||||
Connection fees on new development property: | |||||||||||
Residential single dwelling | $545 per connection or unit | Includes condominiums and twin homes single dwellings | 17.72.030 | ||||||||
Multi-family dwellings | |||||||||||
Duplex | $818 | 17.72.030 | |||||||||
Triplex | $1,226 | 17.72.030 | |||||||||
Townhouse/Apartment, per unit | $409 | per unit | 17.72.030 | ||||||||
Commercial/Industrial | |||||||||||
Without kitchen or restaurant | $273 | per dwelling unit | 17.72.030 | ||||||||
With a kitchen or restaurant | $363 | per dwelling unit | 17.72.030 | ||||||||
With a kitchen and a restaurant | $363 | per dwelling unit | 17.72.030 | ||||||||
General commercial and industrial | $27 per each equivalent fixture unit | Base on Utah plumbing code | 17.72.030 | ||||||||
Trailer Park | $545 per equivalent fixture unit | Three trailer spaces shall equal one residential single dwelling unit | 17.72.030 | ||||||||
Recreation park | $545 per equivalent fixture unit | Six trailer spaces shall equal one residential single dwelling | 17.72.030 | ||||||||
Special industrial and commercial uses | $27 per equivalent fixture unit, as specified in uniform plumbing code | Including car washes, Laundromats,, etc. | 17.72.030 | ||||||||
Sewer connection fees on property with prior development: | |||||||||||
Residential building | See Section 17.72.030 | 17.72.030 | |||||||||
Commercial building | See Section 17.72.030 | Hotel, motel, industrial building, etc. | 17.72.030 | ||||||||
Temporary sewer connections | $500 | Not to exceed 24 months | 17.72.030 | ||||||||
Unauthorized manhole or utility access | |||||||||||
First incident | $500 | 17.36.220 | |||||||||
Subsequent Incidents | Previous charge + $500 | 17.36.220 | |||||||||
SANITARY SEWER PERMITS |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 42 |
For questions regarding Sanitary Sewer Permits contact: 801.483.6727 | |||||||||||
Service | Fee | Additional Information | |||||||||
Sewer Permit Fees | Section | ||||||||||
Sewer and miscellaneous inspection | $165 | 17.72.030 | |||||||||
Sewer and miscellaneous inspection after hours Monday through Friday | $200 | 17.72.030 | |||||||||
Sewer and miscellaneous inspection - On weekends and callout | $465 | 17.72.030 | |||||||||
Grease trap survey and inspection | $165 | 17.72.030 | |||||||||
Sewer repair inspection | $135 | 17.72.030 | |||||||||
Sewer repair inspection after hours Monday through Friday | $175 | 17.72.030 | |||||||||
Trial sewer survey | $100 | 17.72.030 | |||||||||
Sewer survey | $130 | 17.72.030 | |||||||||
Resurvey charge | $130 | Each Occasion | 17.72.030 | ||||||||
Installation of sewer manhole connection, special wyes and tees up to 8-inches | $219 | 17.72.030 | |||||||||
Installation of sewer manhole connection, special wyes and tees greater than 8-inches | $319 | 17.72.030 | |||||||||
Video inspection | $62 | 17.72.030 | |||||||||
Sewer Construction, Connection and Repair Permits | |||||||||||
Additional surveys or inspections Fee | Fee to cover the cost of the work | 17.44.030 | |||||||||
Application for repairs and replacements fee | Fee to cover the cost of the work | 17.44.040 | |||||||||
Trial sewer survey fee | Fee to cover the cost of the work | 17.44.030 | |||||||||
Re-inspection additional fee | Fee to cover the cost of the work | See Section 17.44.110 | 17.44.040 | ||||||||
Survey stakes resetting fee | Fee to cover the cost of the work | 17.44.030 | |||||||||
Opening sewer when junction pipe not available | Fee to cover the cost of the work | 17.44.040 | |||||||||
Replacing damaged junction pipe | Fee to cover the cost of the work | 17.44.030 | |||||||||
Sewer Lateral Kills | Fee to cover the cost of the work | Per Occurrence | 17.72.030 | ||||||||
SANITARY SEWER PRETREATMENT PROGRAM | |||||||||||
For questions regarding Sanitary Sewer Pretreatment Program contact: 801.799.4002 | |||||||||||
Service | Fee | Additional Information | Section | ||||||||
Pretreatment Program services | |||||||||||
Permit application | Determined by Publicly Owned treatment Works (POTW) | For Provisions see Section 17.52.030 | 17.52.040 | ||||||||
Metering of sewage flows | Based upon actual sewer meter readings | 17.72.030 | |||||||||
Sample and analysis fees | Fee to cover all cost associated with labor and testing | 17.64.040 | |||||||||
New Industrial Wastewater Discharge Permit | $2,750 | 17.64.040 | |||||||||
Industrial Wastewater Discharge Permit Renewal | $1,990 | 17.64.040 | |||||||||
Pretreatment Sampling Fees | |||||||||||
Manual sampling | $690 | 17.64.040 | |||||||||
Automatic sampler composite | $425 | 17.64.040 | |||||||||
Grab sample | $205 | 17.64.040 | |||||||||
Grease Interceptor Inspection Fee | |||||||||||
1st trip | Free | 17.64.040 | |||||||||
Additional follow up inspection | $75 | 17.64.040 | |||||||||
3rd trip | $150 | 17.64.040 | |||||||||
Noncompliance Violation Fee | |||||||||||
Notice of Violation for Non-compliance | $100 | Noncompliance violation fee covers fixed cost of notice of violation. Fines for violations may also apply. | 17.64.040 | ||||||||
Significant Non-compliance Violation | $480 | 17.64.040 |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 43 |
SPECIAL EVENTS | ||||
For questions regarding Special Events contact: TBD | ||||
Service | Fee | Additional Information | Section | |
BUILDING RENTAL/USE: CITY AND COUNTY BUILDING - SPECIAL EVENTS | ||||
Damage to City Property | City's Cost | 3.50.080 | ||
COMMUNITY DEVELOPMENT - SPECIAL EVENTS | ||||
Alcohol Concessions Agreement | $450 | Per Applications | 3.50.080 | |
Staffing Charge | $34 | Per hour over 6 hours | 3.50.080 | |
Janitorial Rate | See Notes | Fee is equal to fee charged by facilities for janitorial services | 3.50.080 | |
FIRE - TEMPORARY MEMBRANE STRUCTURES, TENTS OR CANOPIES - SPECIAL EVENTS | ||||
Single event - Initial Inspection | $213 | Up to 180 days. See Also Fire Code under 2.12.040 | 3.50.080 | |
Each additional structure on same site | $1 | See Also Fire Code 2.12.040 | 3.50.080 | |
Re-inspection of additional setup | $1 | Using the same plan that was previously inspected. See Also Fire Code under 2.12.040 | 3.50.080 | |
Non-Combustible Temporary Structures <180 days | $191 | Up to 180 days. | 3.50.080 | |
PARKS AND PUBLIC LANDS - SPECIAL EVENTS | ||||
Site: Set Up/Takedown | $85 | Per Day | 3.50.080 | |
Event Fee | $83 | Per day, 0-299 participants with minimal set up | 3.50.080 | |
Event Fee | $170 | Per day, 300 + participants | 3.50.080 | |
Special Event Permit | $147 | Commercially related (community events) | 3.50.080 | |
Special Event Filming Permit | $147 | 21A.42.070 | ||
Special Event Demonstrations (Free Expression) | $6 | 21A.42.070 | ||
Facility Reservation Cleanup and Repair Fees | ||||
Supervisor | $36 | Per Hour | 3.50.080 | |
Graffiti Response Tech | $22 | Per Hour | 3.50.080 | |
General Maintenance Worker | $30 | Per Hour | 3.50.080 | |
Parks Maintenence Technician II | $25 | Per Hour | 3.50.080 | |
Parks Maintenence Technician I | $18 | Per Hour | 3.50.080 | |
Seasonal/Part-time Employee | $18 | Per Hour | 3.50.080 | |
Plumber | $34 | Per Hour | 3.50.080 | |
Irrigation Tech | $29 | Per Hour | 3.50.080 | |
Irrigation Seasonal | $21 | Per Hour | 3.50.080 | |
Electrical Usage | $0.11 | Per Kilowatt Hour - $15.29 Minimum | 3.50.080 | |
Restroom Cleaning | $34 | Per Cleaning | 3.50.080 | |
Damage to City Property | Varies based on damage | Based on city's cost | 3.50.080 | |
Damage to Landscape | ||||
Sod Replacement | $0.44 | Per Square Foot | 3.50.080 | |
Peat Moss | $21 | Per Bale (cost is $21.21) | 3.50.080 | |
Lawn Seed | $135 | Per Bag | 3.50.080 | |
Top Soil | $39 | Per Yard | 3.50.080 | |
Fertilizer | $45 | Per Bag | 3.50.080 | |
Fertilizer 18-24-5 Starter | $62 | Per Bag | 3.50.080 | |
Fertilizer 28-2-10 Slow Release | $46 | Per Bag | 3.50.080 | |
Fertilizer 38-0-0 Fall | $47 | Per Bag | 3.50.080 | |
Tree Replacement | Varies per size of tree | Based on city's cost to replace damaged tree | 3.50.080 | |
Wetting Agent | $120 | Per 40 lb bag | 3.50.080 | |
Wetting Agent + Organic 3-1-0 | $52 | Per 50 lb bag | 3.50.080 | |
Paver Replacement | ||||
Paver Cleaning | $300 per 1/2 day; $600 per day | Based on city's cost | 3.50.080 | |
Equipment Damage and Parts | Varies based on damage | Based on city's cost | 3.50.080 | |
Irrigation Damage and Parts | Varies based on damage | Based on city's cost | 3.50.080 | |
Fuel Costs | Based on City's Cost | 3.50.080 | ||
Use of Equipment | ||||
1 Ton Dump Truck | $34 | Per Hour | 3.50.080 | |
Aerator (Walk Behind) | $11 | Per Hour | 3.50.080 | |
Aerator, Tractor Mounted (including Tractor) | $20 | Per Hour | 3.50.080 | |
ATLV | $18 | Per Hour | 3.50.080 | |
Backhoe | $48 | Per Hour | 3.50.080 | |
Blower, Backpack (Stihl) | $2 | Per Hour | 3.50.080 | |
Blower (Walk Behind) | $8 | Per Hour | 3.50.080 | |
Edger, Grass (Power Trim) | $8 | Per Hour | 3.50.080 |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 44 |
Leafbed/10 Wheeler | $67 | Per Hour | 3.50.080 | |
Loader | $68 | Per Hour | 3.50.080 | |
Mixer | $13 | Per Hour | 3.50.080 | |
Mower, Bagger (Snapper) | $8 | Per Hour | 3.50.080 | |
Mower, Riding (Toro/Kubota) | $20 | Per Hour | 3.50.080 | |
Mower, Side Discharge (Eastman) | $7 | Per Hour | 3.50.080 | |
Mower, Wide Area (Jacobsen 9016) | $42 | Per Hour | 3.50.080 | |
Pickup Truck | $17 | Per Hour | 3.50.080 | |
Plow, Jeep Mounted (Including Jeep) | $12 | Per Hour | 3.50.080 | |
Plow, Truck (Including Truck) | $24 | Per Hour | 3.50.080 | |
Pressure Washer | $9 | Per Hour | 3.50.080 | |
Pressure Washer with Heat | $21 | Per Hour | 3.50.080 | |
Snowthrower (Toro) | $3 | Per Hour | 3.50.080 | |
Sprayer, Pull Behind (Including Pickup) | $19 | Per Hour | 3.50.080 | |
Spreader Top Dresser, Pull Behind (Including Pickup) | $19 | Per Hour | 3.50.080 | |
Sweeper, Tractor Mounted (Including | $34 | Per Hour | 3.50.080 | |
Track hoe | $18 | Per Hour | 3.50.080 | |
Tractor and Seeder | $18 | Per Hour | 3.50.080 | |
Trimmer, Hedger (Stihl) | $5 | Per Hour | 3.50.080 | |
Trimmer, Line (Maruyama, Echo) | $17 | Per Hour | 3.50.080 | |
Utility Truck 4X4 | $14 | Per Hour | 3.50.080 | |
Truck with Trailer | $20 | Per Hour | 3.50.080 | |
PARKING AND TRAFFIC - SPECIAL EVENTS | ||||
Temporary Placing of Bags on Parking Meters | $50 | Per meter, per day | 12.56.210 | |
During filming of a movie/television series/ commercial | $12 | Per day | 12.56.210 | |
For an event that continues for not less than 3 days | $12 | Per day/must significantly foster area business promotion and have an expected attendance exceeding 5,000 | 12.56.210 | |
For use under the direction of the city in connection with a city sponsored event | No Charge | 12.56.210 | ||
POLICE - SPECIAL EVENTS | ||||
Police Coverage | $103 | Per hour, per officer, not to exceed actual cost | 3.50.080 | |
Police Special Equipment Fee (Car Charge) | $3 | Per Hour, plus fuel surcharge | 3.50.080 | |
Community Response Team | $54 | Per hour, not to exceed actual cost | ||
Barricade Fee | $20 | Per street closure | ||
Vehicle Relocation Fee - Small | $80 | Light Vehicle with a GVWR of 10,000 lbs or less | 12.56.540 | |
Vehicle Relocation Fee - Mid | $110 | Medium Vehicle with a GVWR of 10,001 lbs to 26,000 lbs | 12.56.540 | |
Vehicle Relocation Fee - Large | $140 | Large Vehicle with a GVWR of 26,001 lbs or greater | 12.56.540 | |
WASTE & RECYCLING - SPECIAL EVENTS | ||||
Can Delivery, Removal & 1st Dump <100 cans | $20 | Each Can/Per Event | 3.50.080 | |
Can Delivery, Removal & 1st Dump >100 cans | $25 | Each Can/Per Event | 3.50.080 | |
Recycling Can Contamination | $22 | Each Can/Per Event | 3.50.080 | |
Additional Can Dump Service | $2 | Each Can/Dump | 3.50.080 | |
Can Replacement Cost | Actual Cost | Each Can/Contract Cost | 3.50.080 | |
Landfill Tipping Fee | Actual Cost | Per Ton | 3.50.080 | |
Landfill Tipping Fee (Hazardous Material) | Actual Cost | Per Ton | 3.50.080 | |
Waste & Recycling - Special Events, Use of Equipment | ||||
Flat Bed Truck | $34 | Per Hour | 3.50.080 | |
Leafbed/10 Wheeler | $84 | Per Hour | 3.50.080 | |
Loader | $78 | Per Hour | 3.50.080 | |
Refuse Packer | $54 | Per Hour | 3.50.080 | |
Trailer | $4 | Per Hour | 3.50.080 | |
Waste & Recycling - Special Events, Staff Costs | ||||
Full-Time Employee | $35 | Per Hour | 3.50.080 | |
Supervisor | $57 | Per Hour | 3.50.080 | |
Seasonal Employee | $23 | Per Hour | 3.50.080 |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 45 |
Special Event Permits Per Day in Protected Watershed Areas (Races, walks, filming, etc) | |||||||||||||||
# of Participants | Fee | Deposit | Additional Information | ||||||||||||
0 to 20 | $0 | $0 | One toilet required per 40 participants at start. Running races over 5 miles require toilets at intermittent mile markers and aid stations (e.g. miles 1,3,5…) | 17.08.030 | |||||||||||
20 to 50 | $25 | $50 | |||||||||||||
50 to 100 | $50 | $100 | |||||||||||||
100 to 200 | $100 | $200 | |||||||||||||
200 to 400 | $200 | $500 | |||||||||||||
400 to 600 | $500 | $1,000 | |||||||||||||
600 to 1,000 | $1,000 | $2,000 | |||||||||||||
*Over 1,000 | *Contacted watershed manager | ||||||||||||||
Filming Fees (per day) | $200 minimum to $1,000 minimum |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 46 |
STORM WATER | ||||
For questions regarding Storm Water contact: 801.483.6727 | ||||
Service | Fee | Additional Information | Section | |
Drainage fee | $374 | Per 1/4 acre, rounded up | 17.81.400 | |
Storm Drainage Lateral Survey | $130 | Connection from connection point to first box or back of curb | 17.16.050 | |
Storm Drainage Resurvey | $70 | 17.16.050 | ||
Storm Drainage Connection Inspection | $165 | Includes connection inspection and c/o inspection | 17.16.050 | |
Storm Drain Detention/Retention Inspection | $165 | 17.16.050 | ||
Storm Drain Lateral Connection Permit | $125 | Lateral connection to pipe or curb/gutter | 17.16.050 | |
Storm Water Fees | ||||
Single family residential and duplex parcels, less than 0.25 acres | $8.75 | Per month | 17.81.200 | |
Single family residential and duplex parcels, more than 0.25 acres | $12.25 | Per month | 17.81.200 | |
Triplex and fourplex residential | $17.5 | Per month | 17.81.200 | |
All other developed parcels | $8.75 per ERU | Per month, see Section 17.81.200 for formula | 17.81.200 | |
Undeveloped parcels | No assessment levied | 17.81.200 | ||
Parcel mitigation credit | Formula based | See Section 17.81.200 | 17.81.200 | |
Low income abatement | 50% reduction to service charge | See Section 17.81.200 | 17.81.200 | |
Non-service abatement | Formula based | See Section 17.81.200 | 17.81.200 | |
Storm water inspection fee/SWPPP | $132 | Initial Construction/SWPPP fee | 17.16.050 | |
Discharge into City Storm Water Sewer System / Notice of Intent (NOI) | $132 | Construction/Dewatering/Industrial Discharge | 17.84.400 | |
Discharge into City Storm water Sewer System Registration Fee/Preconstruction Fee | $44 | Construction/Dewatering Discharge | 17.84.400 | |
Discharge into City Storm Water Re-inspection Fee | $44 | Construction/Dewatering/Industrial Discharge | 17.16.050 |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 47 |
STREET LIGHTING | ||||||||
For questions regarding Street Lighting fees contact: 801.498.6700 | ||||||||
Service | Fee | Additional Information | Section | |||||
Base Level Lighting Services City-Wide | $5.19 Per ERU | Per month. No bills shall be less one ERU. | 17.95.300 | |||||
Enhanced Lighting Fees | ||||||||
Group 1 Decorative Lights - High Efficiency | $7.89 per ERU | Per month - residential | 17.95.300 | |||||
Group 2 Decorative Lights | $22.17 per ERU | Per month - residential | 17.95.300 | |||||
Group 3 Decorative Multi- Head Lights | $60.97 per ERU | Per month - commercial | 17.95.300 | |||||
Note: 1 ERU = 1 residential property or 75 feet of street frontage for non-residential properties. | ||||||||
1 - Group 1 rates apply to the existing, predominantly residential properties with a number of enhanced decorative lights; lights have generally received energy efficiency upgrades and large capital expenditures are not expected within the year. | ||||||||
2 - Group 2 rates apply to the existing, predominantly residential properties with a number of enhanced decorative lights; many lights require energy efficiency upgrades and large capital expenditures are scheduled within the year. | ||||||||
3 - Group 3 rates apply to the existing properties in the predominantly commercial area with a number of enhanced decorative lights; many lights require energy efficiency upgrades and large capital expenditures are scheduled within the year. |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 48 |
WATER | |||||||||||||||
For questions regarding Water fees contact: 801.483.6900 | |||||||||||||||
Service | Fee | ||||||||||||||
Monthly Service Fee | |||||||||||||||
Size of connection | Monthly Amount | ||||||||||||||
City | County | ||||||||||||||
5/8 inch - 3/4 inch | $22.48 | $30.35 | 17.16.670 | ||||||||||||
1 inch | $28.57 | $38.57 | 17.16.670 | ||||||||||||
1 1/2 inch | $43.66 | $58.94 | 17.16.670 | ||||||||||||
2 inch | $61.85 | $83.50 | 17.16.670 | ||||||||||||
3 inch | $110.40 | $149.04 | 17.16.670 | ||||||||||||
4 inch | $164.95 | $222.68 | 17.16.670 | ||||||||||||
6 inch | $316.43 | $427.18 | 17.16.670 | ||||||||||||
8 inch | $498.28 | $672.68 | 17.16.670 | ||||||||||||
10 inch | $710.49 | $959.16 | 17.16.670 | ||||||||||||
12 inch | $1,036.26 | $1,398.95 | 17.16.670 | ||||||||||||
Fire Hydrant | $399.49 | $539.31 | 17.16.590 | ||||||||||||
Low Income Abatement: Customer who are granted abatement for taxes on their dwelling shall be granted a five dollar fifty cent ($5.50) abatement of the minimum monthly charge. | |||||||||||||||
Size of connection | Monthly Amount | ||||||||||||||
City | County | ||||||||||||||
2 inch | $0.84 | $1.13 | 17.16.520 | ||||||||||||
3 inch | $1.68 | $2.27 | 17.16.520 | ||||||||||||
4 inch | $2.62 | $3.54 | 17.16.520 | ||||||||||||
6 inch | $5.23 | $7.06 | 17.16.520 | ||||||||||||
8 inch | $8.38 | $11.31 | 17.16.520 | ||||||||||||
10 inch | $12.04 | $16.25 | 17.16.520 | ||||||||||||
12 inch | $17.67 | $23.85 | 17.16.520 | ||||||||||||
Water Meter Rates | |||||||||||||||
Account Type | Amount Used | Volumetric Rate | |||||||||||||
City | County | ||||||||||||||
Single family residence | Block 1: 0-5 hundred cubic feet | $2.84 | $3.83 | ||||||||||||
Block 2: 6-10 hundred cubic feet (except as increased for Urban Vegetable Gardens) | $3.49 | $4.71 | |||||||||||||
Block 3: 11-40 hundred cubic feet | $4.46 | $6.02 | |||||||||||||
Block 4: >40 hundred cubic feet | $4.92 | $6.64 | |||||||||||||
Duplex residence / or Single residence with Accessory Dwelling Unit | Block 1: 0-10 hundred cubic feet | $2.84 | $3.83 | ||||||||||||
Block 2: 11-20 hundred cubic feet | $3.49 | $4.71 | |||||||||||||
Block 3: 21-80 hundred cubic feet | $4.46 | $6.02 | |||||||||||||
Block 4: >80 hundred cubic feet | $4.92 | $6.64 |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 49 |
Triplex residence | Block 1: 0-15 hundred cubic feet | $2.84 | $3.83 | ||||||||||||
Block 2: 16-30 hundred cubic feet | $3.49 | $4.71 | |||||||||||||
Block 3: 31-120 hundred cubic feet | $4.46 | $6.02 | |||||||||||||
Block 4: >120 hundred cubic feet | $4.92 | $6.64 | |||||||||||||
City Rates | County Rates | ||||||||||||||
Summer Rate (April - October) | Winter Rate (November - March) | Summer Rate (April - October) | Winter Rate (November - March) | ||||||||||||
Multi-Family Residential | 3.35 | $2.18 | $4.52 | $2.94 | |||||||||||
Commercial and Non-Residential | 3.53 | $2.18 | $4.77 | $2.94 | |||||||||||
Note: | |||||||||||||||
Customers with defective plumbing or unexplained deceases in usage of more than 25 percent may be adjusted back to a prior AWC, or be assigned the class average by meter size. In cases where class average is not available or is not reasonable, the Director may use other consumption information specific to such account to determine AWC. | |||||||||||||||
The amount used is referred to as a block or tier rate. | |||||||||||||||
Account Type | Amount Used | Volumetric Rate | |||||||||||||
Irrigation | City | County | |||||||||||||
100 Cubic feet to target budget | $2.93 | $3.96 | |||||||||||||
Over target budget Up to 300% of target budget | $4.09 | $5.52 | |||||||||||||
Over 300% of target budget | $4.30 | $5.81 | |||||||||||||
Note: "Irrigation account" means an account established for applying water for irrigation and landscaping only, as determined by the Public Utilities Director or designee. "Target budget" means the estimated amount of water consumed per acre, as established by the Public Utilities Director or designee each year for customer based on factors including, but not limited to, evapotranspiration, and considering efficient water practices. A different target budget is established for each month of the irrigation season. | |||||||||||||||
Account Type | Amount Used | Rate (Summer) | Flat Rate (Winter) | ||||||||||||
Secondary Irrigation | Per Acre Foot | Per ccf | Per Acre Foot | Per ccf | |||||||||||
0 Cubic feet to target budget | $285.32 | $0.66 | |||||||||||||
Over target budget Up to 300% of target budget | $653.04 | $1.50 | $285.32 | $0.66 | |||||||||||
Over 300% of target budget | $1,096.76 | $2.52 | |||||||||||||
Note: "Secondary Irrigation account" means an account established for applying water for irrigation and landscaping secondary to the culinary water system for select municipal parks and golf courses only, as determined by the Public Utilities Director or her designee. "Target budget" means the estimated amount of water consumed per acre, as established by the Public Utilities Director or designee each year for customer based on factors including, but not limited to, evapotranspiration, and considering efficient water practices. A different target budget is established for each month of the irrigation season. | |||||||||||||||
Miscellaneous Fees | City | County | |||||||||||||
Urban Vegetable Garden Credit Adjustment | Credit per ordinance | NA | Based on garden size | 17.16.685 | |||||||||||
Deposit for water - residential | $75 | $75 | 17.16.380 | ||||||||||||
Deposit for water - business | $100 | $100 | Retail, warehouse, offices | 17.16.380 | |||||||||||
Deposit for water - small restaurants | $150 | $150 | 17.16.380 | ||||||||||||
Deposit for water - Laundromats, large restaurants | $300 | $300 | 17.16.380 | ||||||||||||
Deposit for water - car washes | $600 | $600 | 17.16.380 | ||||||||||||
Meter Test Fee - 5/8" to 1" | $145 | 17.16.050 | |||||||||||||
Meter Test Fee - 1 1/2" to 2" | $290 | 17.16.050 | |||||||||||||
Meter Test Fee - larger than 2" | Actual costs | 17.16.050 | |||||||||||||
Water turn on - turn off | $30 | 17.16.660 | |||||||||||||
Illegal turn on fee | $80 | $80 | 17.16.660 |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 50 |
Bankruptcy deposit | Highest two monthly bills over the previous 12 months period | 17.16.660 | |||||||||||||
Charges for water | Minimum charges apply | See Section 17.16.590 | 17.16.590 | ||||||||||||
Damage to padlock, inline lock or lock out sleeve | Actual costs | 17.16.050 | |||||||||||||
Deposit for fire hydrant meter | $1,000 | $100 not refundable | 17.16.050 | ||||||||||||
Opt-out of Advance Metering Infrastructure (AMI) -monthly fee | $40 | 17.16.050 | |||||||||||||
Rain Barrel | Actual Costs | Plus sales tax | |||||||||||||
Grass Seed | Actual Costs | Plus sales tax | |||||||||||||
Unauthorized meter, hydrant, or utility access | |||||||||||||||
First incident | $500 | 17.16.810 | |||||||||||||
Subsequent incidents | previous charge + $500 | 17.16.810 | |||||||||||||
Plumber or Contractor First incident | $1,000 | 17.16.110 | |||||||||||||
Plumber or Contractor Subsequent incidents | previous charge +$500 | 17.16.110 | |||||||||||||
Construction Water - Fill-up at Department on Public Utilities | $50 | Includes 4 fill-ups at Public Utilities shops | |||||||||||||
Canyon water surplus sales (for contracts that are not tied to the rate established by the average MWDSLS rate paid by SLC) | |||||||||||||||
Contract volume 800 gallons per day | $415.65 per year or current MWDSLS rate | 17.04.030 | |||||||||||||
Contract volume 400 gallons per day | $207.83 per year or current MWDSLS rate | 17.04.030 | |||||||||||||
Water Connection Fees - Contact 801.483.6727 | 17.16.040 | ||||||||||||||
Classification | Dwelling | Meter Size | City Connection Fee** | County Connection Fee** | Meter Hardware & Installation Fee* | ||||||||||
Residential | Single family | 3/4 inch | $1,871.00 | $1,952.00 | *See Note - actual cost | ||||||||||
Single family | 1 inch | $3,297.00 | $3,494.00 | *See Note - actual cost | |||||||||||
Duplex | 1 inch | $2,234.00 | $2,432.00 | *See Note - actual cost | |||||||||||
Triplex | 1 inch | $2,371.00 | $2,492.00 | *See Note - actual cost | |||||||||||
Fourplex | 1 inch | $3,401.00 | $3,580.00 | *See Note - actual cost | |||||||||||
Commercial/Industrial | Culinary Meter | 3/4 inch | $2,000.00 | $2,125.00 | *See Note - actual cost | ||||||||||
1 inch | $3,830.00 | $4,213.00 | *See Note - actual cost | ||||||||||||
1.5 inch | $7,584.00 | $8,322.00 | *See Note - actual cost | ||||||||||||
2 inch | $11,776.00 | $12,834.00 | *See Note - actual cost | ||||||||||||
3 inch | $23,678.00 | $25,838.00 | *See Note - actual cost | ||||||||||||
4 inch | $27,359.00 | $27,359.00 | *See Note - actual cost | ||||||||||||
6 inch | $54,718.00 | $54,718.00 | *See Note - actual cost | ||||||||||||
8 inch | $87,549.00 | $87,549.00 | *See Note - actual cost | ||||||||||||
* Cost includes actual hardware cost, meter construction costs, labor costs, and one inspection. Price will be provided upon request. | |||||||||||||||
**Meters not listed will be charged at actual hardware cost, inspection fees, and applicable resource and impact fees. | |||||||||||||||
***For meters 4-inches and larger a water resource fee shall be added. The fee is based on the ratio of the projected usage (gpd) as determined by the AWWA M-22 method to the equivalent residential unit amount of 449 gpd multiplied by $106. | |||||||||||||||
Fire Service Connection Charges *** Contact number 801.483.6727 | |||||||||||||||
Detector check - Fee listed does not include hardware and meter. Any hardware and meter to be charged at actual cost. | |||||||||||||||
6-inch | Price upon request | Not allowed for new development or redevelopment - replacement only. | 17.16.050 | ||||||||||||
8-inch | $3,334.20 | 17.16.050 | |||||||||||||
10-inch | $5,272.02 | 17.16.050 | |||||||||||||
Fire Lines -Fee listed does not include hardware and meter. Any hardware and meter to be charged at actual cost. | |||||||||||||||
2-inch | $355.00 | 17.16.050 | |||||||||||||
4-inch | $355.00 | 17.16.050 | |||||||||||||
6-inch | $601.00 | 17.16.050 | |||||||||||||
8-inch | $819.00 | 17.16.050 | |||||||||||||
10-inch | $1,091.00 | 17.16.050 | |||||||||||||
12-inch | $1,309.00 | 17.16.050 | |||||||||||||
Water Inspection Fees ***Contact number 801.483.6727 | |||||||||||||||
New hydrant inspection | $135.00 | Per each inspection | 17.16.050 | ||||||||||||
New hydrant inspection - Long | $240.00 | Per each inspection | 17.16.050 | ||||||||||||
Water inspection fees | $110.00 | New installation, repair, service, or terminate (kill) inspection; Per each inspection or trip | 17.16.050 | ||||||||||||
Relocation of hydrant inspection | $220.00 | Includes move and terminate | 17.16.050 | ||||||||||||
Relocation of water meter inspection | $220.00 | Includes move and terminate | 17.16.050 | ||||||||||||
Water Used During Construction |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 51 |
Residential | Metered Rates | 17.16.350 | |||||||||||||
Commercial | Metered rates | 17.16.350 | |||||||||||||
Other Water Utility Fees | |||||||||||||||
Water Pressure Test (Flow Test) for Water Mains under 12" | $455.00 | Per Test | 17.16.050 | ||||||||||||
Water Pressure Test (Flow Test) for water mains greater than 12: | $800.00 | Per Test | 17.16.050 | ||||||||||||
Kills - Meters under 3" | $55.00 | 17.16.050 | |||||||||||||
Kills - Meters 3" or larger | $160.00 | 17.16.050 | |||||||||||||
Inspect Auto Fire Sprinklers less than 2" | $136.00 | Per Inspection | 17.16.040 | ||||||||||||
Inspect Auto Fire Sprinklers 2" or greater | $369.00 | Per Inspection | 17.16.040 | ||||||||||||
Plan Review Fee - Less than 1 acre | $216.00 | Per Review | 17.16.050 | ||||||||||||
Plan Review Fee - Tenant Remodel/Residential Remodel | $39.00 | Per Review | 17.16.050 | ||||||||||||
Plan Review Fee - 1 - 5 acres | $1,060.00 | Per Review | 17.16.350 | ||||||||||||
Plan Review Fee - Greater than 5 acres | $2,124.00 | Per Review | 17.16.050 |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 52 |
WATERSHED RECREATIONAL FEES | |||||||||||||||
For questions regarding Watershed Recreational fees contact: 801.483.6880 | |||||||||||||||
Service | Fee | Additional Information | Section | ||||||||||||
Affleck Park Site Fees | |||||||||||||||
Single Site | $15 | Per day | 17.08.030 | ||||||||||||
Group area #2 | $50 | Per day | 17.08.030 | ||||||||||||
Group area #3 | $100 | Per day | 17.08.030 | ||||||||||||
Little Dell Recreation Area Site Fee | |||||||||||||||
Vehicle entry | $5 | Per car | 17.08.030 | ||||||||||||
Season pass | $50 | 17.08.030 | |||||||||||||
Senior season pass | $25 | 17.08.030 | |||||||||||||
City Creek Canyon Entry Fee | |||||||||||||||
Vehicle entry | $3 | Per car | 17.08.030 | ||||||||||||
Site fees for picnic areas | $3 - $75 | 17.08.030 | |||||||||||||
Permits for Dogs in the Watershed – Applicants should refer to Section 17.04.160 of the City Code for information. If a bond is not submitted to Salt Lake County, the following deposit shall be paid. | |||||||||||||||
Initial deposit - no violation | $100 | 17.04.160(E) | |||||||||||||
Second deposit - after first violation | $300 | 17.04.160(F) | |||||||||||||
Third deposit - after second violation | $500 | 17.04.160(F) | |||||||||||||
Special Event Permits Per Day in Protected Watershed Areas (Races, walks, filming, etc.) | |||||||||||||||
# of Participants | Fee | Deposit | Additional Information | ||||||||||||
0 to 20 | $0 | $0 | One toilet required per 40 participants at start. Running races over 5 miles require toilets at intermittent mile markers and aid stations (e.g. miles 1,3,5…) | 17.08.030 | |||||||||||
20 to 50 | $25 | $50 | |||||||||||||
50 to 100 | $50 | $100 | |||||||||||||
100 to 200 | $100 | $200 | |||||||||||||
200 to 400 | $200 | $500 | |||||||||||||
400 to 600 | $500 | $1,000 | |||||||||||||
600 to 1,000 | $1,000 | $2,000 | |||||||||||||
*Over 1,000 | *Contacted watershed manager | ||||||||||||||
Filming Fees (per day) | $200 minimum to $1,000 minimum |
Amended 06/10/2025 by Ord. 2025 - 34 | Page 53 |
GENERAL FUNDS MISCELLANEOUS FEES | ||||
For questions regarding General Funds Miscellaneous Fees contact: TBD | ||||
Service | Fee | Additional Information | Section | |
Collection Fee | $64 | 3.16.050 | ||
Legal Fee | $248 | 2.75.040 | ||
Credit Card Use Surcharge | 2.4% | This fee will be added at the register to all qualifying credit card transactions described in Section 3.16.060 of the Salt Lake City Code. **Max Galaxy, Sportsman software and Library Parking Garage does not assess the credit card charge** | 3.16.060 | |
Pedestrian Crosswalk Flags | ||||
Plain Orange Non-Reflective Crosswalk Flag | $2.10 | Sponsor chooses which type of flag to use and is responsible for keeping the flags in stock. No fees assessed for flags sponsored in school zones. | 12.76.100 | |
Orange Reflective Crosswalk Flag | $2.10 | Sponsor chooses which type of flag to use and is responsible for keeping the flags in stock. No fees assessed for flags sponsored in school zones. | 12.76.100 | |
Return Check or EFT Transfer | $20 | 2.61.030 | ||
Loan Application Fee | $120 | Each | 03.16.005 |